Optimization on construction machinery considering sequence-dependent setup times and personnel fatigue based on the improved gray wolf and whale algorithm.
In this study, the optimization of construction machinery scheduling within roadbed construction projects is explored, taking into account both personnel fatigue and sequence-dependent setup times. A sophisticated optimization model has been developed to simulate the optimal operation of machinery,...
Saved in:
| Main Authors: | , , |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Public Library of Science (PLoS)
2025-01-01
|
| Series: | PLoS ONE |
| Online Access: | https://doi.org/10.1371/journal.pone.0320753 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|