A Note on Two-Agent Scheduling with Resource Dependent Release Times on a Single Machine
We consider a scheduling problem in which both resource dependent release times and two agents exist simultaneously. Two agents share a common single machine, and each agent wants to minimize a cost function dependent on its own jobs. The release time of each A-agent’s job is related to the amount...
Saved in:
Main Authors: | Peng Liu, Lini Duan |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2015-01-01
|
Series: | Discrete Dynamics in Nature and Society |
Online Access: | http://dx.doi.org/10.1155/2015/503297 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
A Robust Two-Machine Flow-Shop Scheduling Model with Scenario-Dependent Processing Times
by: Chia-Lun Hsu, et al.
Published: (2020-01-01) -
Single-Machine Scheduling to Minimize Total Completion Time and Tardiness with Two Competing Agents
by: Wen-Chiung Lee, et al.
Published: (2014-01-01) -
Nature-Inspired Metaheuristics for Two-Agent Scheduling with Due Date and Release Time
by: Hongwei Li, et al.
Published: (2020-01-01) -
Single-Machine Scheduling Problems with the General Sum-of-Processing-Time and Position-Dependent Effect Function
by: Kunping Shen, et al.
Published: (2021-01-01) -
Two-Agent Scheduling to Minimize the Maximum Cost with Position-Dependent Jobs
by: Long Wan
Published: (2015-01-01)