Inerting Strategy for a Demonstration-Scale Hot Cell Facility Based on Experiences from Pilot-Scale Argon Cell Facility Operation and CFD Analysis

Pyroprocessing is being developed at Korea Atomic Energy Research Institute (KAERI), and in recent years, all process equipment required for integrated processes have been examined in the PyRoprocess-integrated Inactive DEmonstration (PRIDE) facility. Based on the successful operation of a pilot-sca...

Full description

Saved in:
Bibliographic Details
Main Authors: Seungnam Yu, Jaehoon Lim, Ilje Cho, Jonghui Han
Format: Article
Language:English
Published: Wiley 2021-01-01
Series:Science and Technology of Nuclear Installations
Online Access:http://dx.doi.org/10.1155/2021/9997750
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1832563630135050240
author Seungnam Yu
Jaehoon Lim
Ilje Cho
Jonghui Han
author_facet Seungnam Yu
Jaehoon Lim
Ilje Cho
Jonghui Han
author_sort Seungnam Yu
collection DOAJ
description Pyroprocessing is being developed at Korea Atomic Energy Research Institute (KAERI), and in recent years, all process equipment required for integrated processes have been examined in the PyRoprocess-integrated Inactive DEmonstration (PRIDE) facility. Based on the successful operation of a pilot-scale facility, a conceptual design for this scale-up facility was actualized. Implementing a “demonstration-scale” hot cell facility is challenging as it is intended to supersede PRIDE and satisfy the increased requirements of larger-scale facilities. This study focused on an inerting strategy for a larger-scale (demonstration-scale) hot cell facility to achieve conditions equivalent to those in a pilot-scale gas-tight argon cell facility. The study applies the inerting strategy to a demonstration-scale hot cell facility beyond that of the currently existing pilot-scale hot cell facility and performs computational fluid dynamics (CFD) simulation with various flow rates to determine an appropriate approach for inerting the target facility. To this end, practical constraints on the simulation are introduced based on experiences from the existing pilot-scale facility. The results show that the purging flow rate should be accurately predicted, and a variable flow rate should be applied to achieve hot cell inerting effectively. The required purging time and amount of inerting source are essential factors in the larger-scale hot cell facility. The study results can be helpful in the design of large hot cell facilities operated under inert conditions.
format Article
id doaj-art-3e5bf03bbdb048099bbd0a94368b814e
institution Kabale University
issn 1687-6075
1687-6083
language English
publishDate 2021-01-01
publisher Wiley
record_format Article
series Science and Technology of Nuclear Installations
spelling doaj-art-3e5bf03bbdb048099bbd0a94368b814e2025-02-03T01:12:54ZengWileyScience and Technology of Nuclear Installations1687-60751687-60832021-01-01202110.1155/2021/99977509997750Inerting Strategy for a Demonstration-Scale Hot Cell Facility Based on Experiences from Pilot-Scale Argon Cell Facility Operation and CFD AnalysisSeungnam Yu0Jaehoon Lim1Ilje Cho2Jonghui Han3Korea Atomic Energy Research Institute, 111, Daedeok-daero 989 Beon-Gil, Yuseong-Gu, Daejeon 34057, Republic of KoreaKorea Atomic Energy Research Institute, 111, Daedeok-daero 989 Beon-Gil, Yuseong-Gu, Daejeon 34057, Republic of KoreaKorea Atomic Energy Research Institute, 111, Daedeok-daero 989 Beon-Gil, Yuseong-Gu, Daejeon 34057, Republic of KoreaKorea Atomic Energy Research Institute, 111, Daedeok-daero 989 Beon-Gil, Yuseong-Gu, Daejeon 34057, Republic of KoreaPyroprocessing is being developed at Korea Atomic Energy Research Institute (KAERI), and in recent years, all process equipment required for integrated processes have been examined in the PyRoprocess-integrated Inactive DEmonstration (PRIDE) facility. Based on the successful operation of a pilot-scale facility, a conceptual design for this scale-up facility was actualized. Implementing a “demonstration-scale” hot cell facility is challenging as it is intended to supersede PRIDE and satisfy the increased requirements of larger-scale facilities. This study focused on an inerting strategy for a larger-scale (demonstration-scale) hot cell facility to achieve conditions equivalent to those in a pilot-scale gas-tight argon cell facility. The study applies the inerting strategy to a demonstration-scale hot cell facility beyond that of the currently existing pilot-scale hot cell facility and performs computational fluid dynamics (CFD) simulation with various flow rates to determine an appropriate approach for inerting the target facility. To this end, practical constraints on the simulation are introduced based on experiences from the existing pilot-scale facility. The results show that the purging flow rate should be accurately predicted, and a variable flow rate should be applied to achieve hot cell inerting effectively. The required purging time and amount of inerting source are essential factors in the larger-scale hot cell facility. The study results can be helpful in the design of large hot cell facilities operated under inert conditions.http://dx.doi.org/10.1155/2021/9997750
spellingShingle Seungnam Yu
Jaehoon Lim
Ilje Cho
Jonghui Han
Inerting Strategy for a Demonstration-Scale Hot Cell Facility Based on Experiences from Pilot-Scale Argon Cell Facility Operation and CFD Analysis
Science and Technology of Nuclear Installations
title Inerting Strategy for a Demonstration-Scale Hot Cell Facility Based on Experiences from Pilot-Scale Argon Cell Facility Operation and CFD Analysis
title_full Inerting Strategy for a Demonstration-Scale Hot Cell Facility Based on Experiences from Pilot-Scale Argon Cell Facility Operation and CFD Analysis
title_fullStr Inerting Strategy for a Demonstration-Scale Hot Cell Facility Based on Experiences from Pilot-Scale Argon Cell Facility Operation and CFD Analysis
title_full_unstemmed Inerting Strategy for a Demonstration-Scale Hot Cell Facility Based on Experiences from Pilot-Scale Argon Cell Facility Operation and CFD Analysis
title_short Inerting Strategy for a Demonstration-Scale Hot Cell Facility Based on Experiences from Pilot-Scale Argon Cell Facility Operation and CFD Analysis
title_sort inerting strategy for a demonstration scale hot cell facility based on experiences from pilot scale argon cell facility operation and cfd analysis
url http://dx.doi.org/10.1155/2021/9997750
work_keys_str_mv AT seungnamyu inertingstrategyforademonstrationscalehotcellfacilitybasedonexperiencesfrompilotscaleargoncellfacilityoperationandcfdanalysis
AT jaehoonlim inertingstrategyforademonstrationscalehotcellfacilitybasedonexperiencesfrompilotscaleargoncellfacilityoperationandcfdanalysis
AT iljecho inertingstrategyforademonstrationscalehotcellfacilitybasedonexperiencesfrompilotscaleargoncellfacilityoperationandcfdanalysis
AT jonghuihan inertingstrategyforademonstrationscalehotcellfacilitybasedonexperiencesfrompilotscaleargoncellfacilityoperationandcfdanalysis