Shear Stress Analysis and Crack Prevention Measures for a Concrete-Face Rockfill Dam, Advanced Construction of a First-Stage Face Slab, and a First-Stage Face Slab in Advanced Reservoir Water Storage

Due to the demand in flood season for power generation, the first-stage face slab of a high concrete-face rockfill dam often must be constructed ahead of schedule, and advanced water storage is needed for the reservoir. Since the dam-body filling has not yet been completed at this point, the interna...

Full description

Saved in:
Bibliographic Details
Main Authors: Kongzhong Hu, Jiankang Chen, Dong Wang
Format: Article
Language:English
Published: Wiley 2018-01-01
Series:Advances in Civil Engineering
Online Access:http://dx.doi.org/10.1155/2018/2951962
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1832549500167651328
author Kongzhong Hu
Jiankang Chen
Dong Wang
author_facet Kongzhong Hu
Jiankang Chen
Dong Wang
author_sort Kongzhong Hu
collection DOAJ
description Due to the demand in flood season for power generation, the first-stage face slab of a high concrete-face rockfill dam often must be constructed ahead of schedule, and advanced water storage is needed for the reservoir. Since the dam-body filling has not yet been completed at this point, the internal stress of the first-stage face slab is more complicated than that of normal construction. Taking Buxi Power Station as an example, the first-stage face slab temporary construction seam showed large areas of shear stress damage during the rise in reservoir water levels during the second segment of the second construction stage. The concrete-face slab showed large-piece brittle bulging, and the steel rebar was exposed and developed contortional deformation. Based on the monitoring data for Buxi Power Station along with the first-stage fracture characteristics of Shuibuya concrete face, this paper applied a numerical analysis to conduct research on the causes of fracture mechanics. The results indicate that the cracks occurred on the face slab during the second segment of second-stage water storage primarily due to the advanced concrete pouring of the first-stage face slab; during the first stage of reservoir water storage, the internal stress of the first-stage face slab was not reduced or eliminated prior to second-stage face slab pouring. Thus, with the rise in the reservoir water level, the shear stress increased continuously, eventually leading to partial large-scale shear stress failure of the first-stage face slab. The research results provide important references for the design and construction of concrete-face rockfill dams.
format Article
id doaj-art-3e16ef91dbfe4084b7dd9409aa7b9f63
institution Kabale University
issn 1687-8086
1687-8094
language English
publishDate 2018-01-01
publisher Wiley
record_format Article
series Advances in Civil Engineering
spelling doaj-art-3e16ef91dbfe4084b7dd9409aa7b9f632025-02-03T06:11:06ZengWileyAdvances in Civil Engineering1687-80861687-80942018-01-01201810.1155/2018/29519622951962Shear Stress Analysis and Crack Prevention Measures for a Concrete-Face Rockfill Dam, Advanced Construction of a First-Stage Face Slab, and a First-Stage Face Slab in Advanced Reservoir Water StorageKongzhong Hu0Jiankang Chen1Dong Wang2College of Water Resource & Hydropower, Sichuan University, Chengdu 610065, Sichuan, ChinaCollege of Water Resource & Hydropower, Sichuan University, Chengdu 610065, Sichuan, ChinaCollege of Water Resource & Hydropower, Sichuan University, Chengdu 610065, Sichuan, ChinaDue to the demand in flood season for power generation, the first-stage face slab of a high concrete-face rockfill dam often must be constructed ahead of schedule, and advanced water storage is needed for the reservoir. Since the dam-body filling has not yet been completed at this point, the internal stress of the first-stage face slab is more complicated than that of normal construction. Taking Buxi Power Station as an example, the first-stage face slab temporary construction seam showed large areas of shear stress damage during the rise in reservoir water levels during the second segment of the second construction stage. The concrete-face slab showed large-piece brittle bulging, and the steel rebar was exposed and developed contortional deformation. Based on the monitoring data for Buxi Power Station along with the first-stage fracture characteristics of Shuibuya concrete face, this paper applied a numerical analysis to conduct research on the causes of fracture mechanics. The results indicate that the cracks occurred on the face slab during the second segment of second-stage water storage primarily due to the advanced concrete pouring of the first-stage face slab; during the first stage of reservoir water storage, the internal stress of the first-stage face slab was not reduced or eliminated prior to second-stage face slab pouring. Thus, with the rise in the reservoir water level, the shear stress increased continuously, eventually leading to partial large-scale shear stress failure of the first-stage face slab. The research results provide important references for the design and construction of concrete-face rockfill dams.http://dx.doi.org/10.1155/2018/2951962
spellingShingle Kongzhong Hu
Jiankang Chen
Dong Wang
Shear Stress Analysis and Crack Prevention Measures for a Concrete-Face Rockfill Dam, Advanced Construction of a First-Stage Face Slab, and a First-Stage Face Slab in Advanced Reservoir Water Storage
Advances in Civil Engineering
title Shear Stress Analysis and Crack Prevention Measures for a Concrete-Face Rockfill Dam, Advanced Construction of a First-Stage Face Slab, and a First-Stage Face Slab in Advanced Reservoir Water Storage
title_full Shear Stress Analysis and Crack Prevention Measures for a Concrete-Face Rockfill Dam, Advanced Construction of a First-Stage Face Slab, and a First-Stage Face Slab in Advanced Reservoir Water Storage
title_fullStr Shear Stress Analysis and Crack Prevention Measures for a Concrete-Face Rockfill Dam, Advanced Construction of a First-Stage Face Slab, and a First-Stage Face Slab in Advanced Reservoir Water Storage
title_full_unstemmed Shear Stress Analysis and Crack Prevention Measures for a Concrete-Face Rockfill Dam, Advanced Construction of a First-Stage Face Slab, and a First-Stage Face Slab in Advanced Reservoir Water Storage
title_short Shear Stress Analysis and Crack Prevention Measures for a Concrete-Face Rockfill Dam, Advanced Construction of a First-Stage Face Slab, and a First-Stage Face Slab in Advanced Reservoir Water Storage
title_sort shear stress analysis and crack prevention measures for a concrete face rockfill dam advanced construction of a first stage face slab and a first stage face slab in advanced reservoir water storage
url http://dx.doi.org/10.1155/2018/2951962
work_keys_str_mv AT kongzhonghu shearstressanalysisandcrackpreventionmeasuresforaconcretefacerockfilldamadvancedconstructionofafirststagefaceslabandafirststagefaceslabinadvancedreservoirwaterstorage
AT jiankangchen shearstressanalysisandcrackpreventionmeasuresforaconcretefacerockfilldamadvancedconstructionofafirststagefaceslabandafirststagefaceslabinadvancedreservoirwaterstorage
AT dongwang shearstressanalysisandcrackpreventionmeasuresforaconcretefacerockfilldamadvancedconstructionofafirststagefaceslabandafirststagefaceslabinadvancedreservoirwaterstorage