Risk Assessment of EPB Shield Construction Based on the Nonlinear FAHP Method
There are many risk factors in EPB shield construction. The traditional fuzzy analytic hierarchy process (FAHP) method usually uses a linear analysis method to determine the risk level, but there are often some risk factors with prominent influence, which will reduce the accuracy of the evaluation r...
Saved in:
| Main Authors: | Xueyan Wang, Hang Gong, Qiyu Song, Xiao Yan, Zheng Luo |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Wiley
2022-01-01
|
| Series: | Advances in Civil Engineering |
| Online Access: | http://dx.doi.org/10.1155/2022/9233833 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Risk Assessment of Drilling and Blasting Method Based on Nonlinear FAHP and Combination Weighting
by: Cheng Ji, et al.
Published: (2025-04-01) -
Research on muck conditioning for EPB shield tunnelling in composite formation
by: Yalong Jiang, et al.
Published: (2024-12-01) -
Experimental Study on the Soil Conditioning Materials for EPB Shield Tunneling in Silty Sand
by: Chi-Hao Cheng, et al.
Published: (2020-01-01) -
Excavation Face Stability Analysis of EPB Shield in Half-Chamber Tunneling Mode
by: ZHENG Weigang, et al.
Published: (2025-04-01) -
Effects of flocculants on in–situ recycling potential of waste EPB shield muck with residual foams
by: Yao Lu, et al.
Published: (2025-06-01)