Risk Assessment of EPB Shield Construction Based on the Nonlinear FAHP Method

There are many risk factors in EPB shield construction. The traditional fuzzy analytic hierarchy process (FAHP) method usually uses a linear analysis method to determine the risk level, but there are often some risk factors with prominent influence, which will reduce the accuracy of the evaluation r...

Full description

Saved in:
Bibliographic Details
Main Authors: Xueyan Wang, Hang Gong, Qiyu Song, Xiao Yan, Zheng Luo
Format: Article
Language:English
Published: Wiley 2022-01-01
Series:Advances in Civil Engineering
Online Access:http://dx.doi.org/10.1155/2022/9233833
Tags: Add Tag
No Tags, Be the first to tag this record!