Numerical Investigation on Dynamic Performance of a Bridge-Tunnel Transition Section with a Deep Buried Pile-Plank Structure
To address the track irregularity at transition zones between subgrade and rigid structures (bridge, tunnel, etc.), some common transition approaches, such as trapezoid subgrade, were adopted in many engineering areas. However, in regard to a mountainous area, the common transition approaches may no...
Saved in:
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2020-01-01
|
Series: | Advances in Civil Engineering |
Online Access: | http://dx.doi.org/10.1155/2020/8885535 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|