Optimizing Competency-Based Human Resource Allocation in Construction Project Scheduling: A Multi-Objective Meta-Heuristic Approach
Effective allocation of human resources to project activities is crucial in optimizing project schedules and resource utilization. This paper addresses the challenge of competency-based workforce allocation in construction project scheduling by integrating multi-criteria decision-making with meta-h...
Saved in:
Main Authors: | Bahman Shojaei, Heidar Dashti Naserabadi, Mohammad Javad Taheri Amiri |
---|---|
Format: | Article |
Language: | English |
Published: |
Qubahan
2024-09-01
|
Series: | Qubahan Academic Journal |
Online Access: | https://journal.qubahan.com/index.php/qaj/article/view/1027 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Project Scheduling Heuristics-Based Standard PSO for Task-Resource Assignment in Heterogeneous Grid
by: Ruey-Maw Chen, et al.
Published: (2011-01-01) -
A Heuristic Algorithm for Resource Allocation/Reallocation Problem
by: S. Raja Balachandar, et al.
Published: (2011-01-01) -
A Hybrid Heuristic Algorithm for Ship Block Construction Space Scheduling Problem
by: Shicheng Hu, et al.
Published: (2015-01-01) -
Presentating a multi-objective optimization model for resource-constrained project scheduling regarding financial costs, time delays and the reliability function
by: Saeideh Naderi, et al.
Published: (2025-03-01) -
Solution Algorithms for Single-Machine Group Scheduling with Learning Effect and Convex Resource Allocation
by: Wanlei Wang, et al.
Published: (2021-01-01)