Mitigating the Bridge End Bump Problem: A Case Study of a New Slab System with a Lower Partition Slab-Pile Foundation
This paper describes a case of using a pile-slab composite foundation to handle a bridge-end bump problem. Conventionally, a deep-seated concrete slab method is employed to tackle this problem; however, this method generates a large stress concentration within 1 m from the bridge end. The mechanical...
Saved in:
Main Authors: | Yu Yang, Chuang Yu, Ze-xiang Wu, Dong-mei Tu |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2020-01-01
|
Series: | Advances in Civil Engineering |
Online Access: | http://dx.doi.org/10.1155/2020/7986927 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Nonlinear Analysis Method for Serviceability Investigation of Bridge Deck Ends with a Concrete Slab Track
by: Deokyong Sung
Published: (2018-01-01) -
Behavior of FRP Link Slabs in Jointless Bridge Decks
by: Aziz Saber, et al.
Published: (2012-01-01) -
Nonlinear analysis of reinforced concrete shells and the compressive membrane action on bridge deck slabs
by: Beatriz da Costa Fernandes, et al.
Published: (2025-01-01) -
Improvement on Structural Forms of Pile Group Foundations of Deepwater Bridges
by: Enbo Yu, et al.
Published: (2019-01-01) -
Numerical Analysis of the End-Suspended Pile and the Rock-Socketed Pile Bearing Capacity of a Soil-Rock Composite Foundation Pit
by: Xiaobo Xing, et al.
Published: (2022-01-01)