Analysis and Comparison for under Frame Equipment Suspension Scheme of Ningbo Rail Transit Vehicles

Ningbo rail transit line 1 and line 2 phase I vehicles were designed and manufactured by the same company. The main differences between the two vehicles were the different suspension schemes under the frame, and the technical parameters of the vehicles were basically the same. By summarizing and com...

Full description

Saved in:
Bibliographic Details
Main Authors: Zhangwen LEI, Ke LI, Huijian HUANG
Format: Article
Language:zho
Published: Editorial Department of Electric Drive for Locomotives 2019-03-01
Series:机车电传动
Subjects:
Online Access:http://edl.csrzic.com/thesisDetails#10.13890/j.issn.1000-128x.2019.02.027
Tags: Add Tag
No Tags, Be the first to tag this record!