To Construction of Expendable Hydroelectric Power Station Characteristics and Their Timely Correction
The paper provides a technique of analytical construction of expendable characteristics and characteristics of a relative gain of water charge at a hydroelectric power station. Planning method and regression analysis have been applied for the construction of these characteristics.
Saved in:
| Main Author: | V. Kh. Nasibov |
|---|---|
| Format: | Article |
| Language: | Russian |
| Published: |
Belarusian National Technical University
2006-10-01
|
| Series: | Известия высших учебных заведений и энергетических объединенний СНГ: Энергетика |
| Online Access: | https://energy.bntu.by/jour/article/view/675 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
HYDRAULIC RESEARCH FOR SPILLWAY DAM OF ROUND-CRESTED WEIR AT POLOTSK HYDROELECTRIC POWER STATION
by: G. G. Kruglov, et al.
Published: (2012-10-01) -
Hydraulic Research for Spillway Dam of Grodno Hydroelectric Station
by: G. G. Kruglov, et al.
Published: (2009-04-01) -
MOOCs SHOULD LOOK TOWARDS EXPENDING ITS ADAPTABILITY
by: Nina V. Komleva
Published: (2016-05-01) -
Projects and problems of construction of Terek hydroelectric power plant in 1909-1912
by: Rasul S. Gurtuev, et al.
Published: (2022-09-01) -
Implementation of Security Standardization in Construction of No.3 and No.4 West Diversion Tunnel in Jinping Phase 2 Hydroelectric Station
by: WANG Zhi, et al.
Published: (2010-01-01)