To Construction of Expendable Hydroelectric Power Station Characteristics and Their Timely Correction

The paper provides a technique of analytical construction of expendable characteristics and characteristics of a relative gain of water charge at a hydroelectric power station. Planning method and regression analysis have been applied for the construction of these characteristics.

Saved in:
Bibliographic Details
Main Author: V. Kh. Nasibov
Format: Article
Language:Russian
Published: Belarusian National Technical University 2006-10-01
Series:Известия высших учебных заведений и энергетических объединенний СНГ: Энергетика
Online Access:https://energy.bntu.by/jour/article/view/675
Tags: Add Tag
No Tags, Be the first to tag this record!