Effect of Working Fluid on Characteristics of Organic Rankine Cycle with Medium Temperature Geothermal Water
The total installed geothermal power plant capacity at year-end 2023 was 16,335 MW, while the forecast for the installed capacity in 2025 is 19,331 MW. In Croatia, several medium-temperature geothermal resources (geothermal water) with temperatures from 90 to 200 °C exist, by means of which it is po...