Research on Temporary Support Robot for the Integrated Excavation and Mining System of Section Coal Pillar
Facing the support challenges of short-wall working face (15–40m) roadways in the ‘excavation–backfill–retention’ tunneling method for section coal pillars, traditional equipment struggled to achieve stable, reliable, and efficient support. This paper designed a temporary support robot for the excav...
Saved in:
| Main Authors: | Hongwei Ma, Jiashuai Cheng, Chuanwei Wang, Heng Zhang, Wenda Cui, Xusheng Xue, Qinghua Mao, Peng Liu, Yifeng Guo, Hao Su, Zukun Yu, Peng Wang, Haibo Tian |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
MDPI AG
2025-04-01
|
| Series: | Applied Sciences |
| Subjects: | |
| Online Access: | https://www.mdpi.com/2076-3417/15/9/4896 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Study on the Stribeck Curve of Slider Bearing Lubrication State under Different Load
by: Fang Qunling, et al.
Published: (2016-01-01) -
A method for efficient virtual-physical synchronization of the digital twin system of an excavation-supporting robot cluster targeting coal pillars between mining faces
by: Qinghua MAO, et al.
Published: (2025-05-01) -
Modeling and Analysis of a Cutting Robot for the “Excavation–Backfill–Retention” Integrated Mining and Excavation Equipment
by: Hongwei Ma, et al.
Published: (2025-04-01) -
Balance Control Method for Bipedal Wheel-Legged Robots Based on Friction Feedforward Linear Quadratic Regulator
by: Aimin Zhang, et al.
Published: (2025-02-01) -
Numerical Simulation and Engineering Application of Temporary Stress Field in Coal Mine Roadway
by: Heng Zhang, et al.
Published: (2024-12-01)