Research on Temporary Support Robot for the Integrated Excavation and Mining System of Section Coal Pillar
Facing the support challenges of short-wall working face (15–40m) roadways in the ‘excavation–backfill–retention’ tunneling method for section coal pillars, traditional equipment struggled to achieve stable, reliable, and efficient support. This paper designed a temporary support robot for the excav...
Saved in:
| Main Authors: | , , , , , , , , , , , , |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
MDPI AG
2025-04-01
|
| Series: | Applied Sciences |
| Subjects: | |
| Online Access: | https://www.mdpi.com/2076-3417/15/9/4896 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|