Overhaul and Erection Maintenance Optimization for GuangzhouMetro B-type High-speed Urban Transit Train
Because of the speed characteristics of B-type high-speed urban transit train, overhaul and erection maintenance period of thetrain could not match planned operation mileage well. According to the operation situation of B-type high-speed urban transit train inGuangzhou metro line 3 north-extending l...
Saved in:
| Main Authors: | ZHAO Wei-long, CHEN Zhi-hong |
|---|---|
| Format: | Article |
| Language: | zho |
| Published: |
Editorial Department of Electric Drive for Locomotives
2014-01-01
|
| Series: | 机车电传动 |
| Subjects: | |
| Online Access: | http://edl.csrzic.com/thesisDetails#10.13890/j.issn.1000-128x.2014.03.012 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Speed Control Logic Analysis of Domestic Traction Trains and Siemens Trains in Northern-extension Section of Guangzhou Metro Line 3
by: HE Wenle, et al.
Published: (2016-01-01) -
Linear Motor Vehicle Technology of Guangzhou Metro 6th Line and Difference from 4th & 5th Line Vehicle
by: 游高祥
Published: (2012-01-01) -
Electric Drive System of Domestic A Type Additional Metro Trainsfor Guangzhou Metro
by: HE Hong-cheng, et al.
Published: (2013-01-01) -
Adhesion Control Logic Analysis of Domestic Traction Trains in Guangzhou Metro Third-northern Line
by: FAN Jiafeng, et al.
Published: (2015-01-01) -
Cause Analysis of Slight Fault of MVB Bus in Guangzhou Metro Line 7
by: Peiyang LIN, et al.
Published: (2019-01-01)