Overhaul and Erection Maintenance Optimization for GuangzhouMetro B-type High-speed Urban Transit Train
Because of the speed characteristics of B-type high-speed urban transit train, overhaul and erection maintenance period of thetrain could not match planned operation mileage well. According to the operation situation of B-type high-speed urban transit train inGuangzhou metro line 3 north-extending l...
Saved in:
| Main Authors: | , |
|---|---|
| Format: | Article |
| Language: | zho |
| Published: |
Editorial Department of Electric Drive for Locomotives
2014-01-01
|
| Series: | 机车电传动 |
| Subjects: | |
| Online Access: | http://edl.csrzic.com/thesisDetails#10.13890/j.issn.1000-128x.2014.03.012 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|