On BESS Capacity Optimization of Hybrid Coal-Fired Generator and BESS Power Station for Secondary Frequency Regulation

Integrating battery energy storage systems (BESS) into a coal-fired generator can enhance power systems’ secondary frequency regulation capability. To this end, this paper proposes a policy to coordinate the BESS and the coal-fired generator to meet the automatic generation control (AGC)...

Full description

Saved in:
Bibliographic Details
Main Authors: Xinsong Zhang, Ziyun Ma, Beiping Gu, Lurui Fang, Xiuyong Yu
Format: Article
Language:English
Published: IEEE 2025-01-01
Series:IEEE Access
Subjects:
Online Access:https://ieeexplore.ieee.org/document/10949211/
Tags: Add Tag
No Tags, Be the first to tag this record!