On BESS Capacity Optimization of Hybrid Coal-Fired Generator and BESS Power Station for Secondary Frequency Regulation
Integrating battery energy storage systems (BESS) into a coal-fired generator can enhance power systems’ secondary frequency regulation capability. To this end, this paper proposes a policy to coordinate the BESS and the coal-fired generator to meet the automatic generation control (AGC)...
Saved in:
| Main Authors: | , , , , |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
IEEE
2025-01-01
|
| Series: | IEEE Access |
| Subjects: | |
| Online Access: | https://ieeexplore.ieee.org/document/10949211/ |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|