-
1
Construction and analysis of numerical algorithms for Erdelyi–Kober fractional integral equations
Published 2025-06-01Get full text
Article -
2
Multi-Scale Construction Site Fire Detection Algorithm with Integrated Attention Mechanism
Published 2025-06-01“…To address the issues of large target-scale variations and frequent false detections in construction site fire monitoring, we propose a fire detection algorithm based on an improved YOLOv8 model, achieving real-time and efficient detection of fires on construction sites. …”
Get full text
Article -
3
Integrating Machine Learning Algorithms to Construct a Triaptosis-Related Prognostic Model in Melanoma
Published 2025-06-01“…Key triaptosis-related genes and pathways were identified and incorporated into machine learning models to construct a prognostic signature. The TCGA-SKCM cohort served as the training dataset, and GEO datasets were used for validation.Results: A robust prognostic model based on triaptosis-associated signature (TAS) was established using the SurvivalSVM algorithm. …”
Get full text
Article -
4
Enhancing cybersecurity through autonomous knowledge graph construction by integrating heterogeneous data sources
Published 2025-04-01“…In our research, we construct a cybersecurity knowledge graph (CKG) autonomously using heterogeneous data sources. …”
Get full text
Article -
5
Facilitating Circular Transition in the Construction Industry: Optimizing a Prefabricated Construction Site Layout Using a Novel BIM-Integrated SLP-GA Model
Published 2024-09-01“…This study develops a BIM-based System Layout Planning-Genetic Algorithm (SLP-GA) model specifically tailored for prefabricated construction site optimisation. …”
Get full text
Article -
6
-
7
Integrated decision support system for optimizing time and cost trade offs in linear repetitive construction projects
Published 2025-06-01“…Each sub-task is systematically evaluated to identify the optimal construction method based on cost-time trade-offs, with scheduling constraints integrated into the fitness functions of both GA and PSO. …”
Get full text
Article -
8
-
9
Knowledge Integration and Analysis of Technological Innovation in Prefabricated Construction
Published 2025-01-01Get full text
Article -
10
Assignment Technology Based on Improved Great Wall Construction Algorithm
Published 2025-02-01“…This paper presents an autonomous multi-UAV cooperative task allocation method based on an improved Great Wall Construction Algorithm. A model integrating battlefield environmental factors, 3D terrain data, and threat assessments is developed for optimized task allocation and trajectory planning. …”
Get full text
Article -
11
-
12
Network Security Perception System Integrating Improved CNN Algorithm and Improved GRU Algorithm
Published 2024-01-01“…Additionally, the gated recurrent unit is improved using an adaptive boosting algorithm. A novel network security-aware model integrating both methods is constructed. …”
Get full text
Article -
13
Phase diagram construction and prediction method based on machine learning algorithms
Published 2025-05-01Get full text
Article -
14
Robust Optimization for Integrated Construction Scheduling and Multiscale Resource Allocation
Published 2018-01-01“…This research investigates an integrated problem of construction scheduling and resource allocation. …”
Get full text
Article -
15
Communication and perception integrated positioning system in tunnel construction scenarios
Published 2025-06-01“…This method combines the moving average algorithm with the random forest classification algorithm, and multiple comparative experiments are conducted at the construction site. …”
Get full text
Article -
16
Developing an Integrative Data Intelligence Model for Construction Cost Estimation
Published 2022-01-01Get full text
Article -
17
Global path planning algorithm for mining vehicles integrating simplified visibility graph and A* algorithm
Published 2024-10-01“…To address the low path planning efficiency of mining vehicles in narrow, winding underground tunnels with unknown obstacles, a global path planning algorithm, DVGA*, was proposed, integrating simplified visibility graphs (SVG) and the A* algorithm. …”
Get full text
Article -
18
Construction of Graduate Behavior Dynamic Model Based on Dynamic Decision Tree Algorithm
Published 2022-01-01“…The results show that the big data integration system based on big data and dynamic decision tree algorithm has high adaptability. …”
Get full text
Article -
19
Whale Algorithm for Schedule Optimization of Construction Projects Employing Building Information Modeling
Published 2025-03-01“…ABSTRACT This study introduces a new approach by applying the Whale Optimization Algorithm (WOA) to create construction schedules using geometric data from Building Information Modeling (BIM). …”
Get full text
Article -
20
Construction of prognostic scoring model for ovarian cancer based on deep learning algorithm
Published 2025-07-01“…The CLAM framework was applied to construct a prognostic model validated via time-dependent ROC and survival analysis. …”
Get full text
Article