-
1
Construction and analysis of numerical algorithms for Erdelyi–Kober fractional integral equations
Published 2025-06-01Get full text
Article -
2
Multi-Scale Construction Site Fire Detection Algorithm with Integrated Attention Mechanism
Published 2025-06-01“…To address the issues of large target-scale variations and frequent false detections in construction site fire monitoring, we propose a fire detection algorithm based on an improved YOLOv8 model, achieving real-time and efficient detection of fires on construction sites. …”
Get full text
Article -
3
Integrating Machine Learning Algorithms to Construct a Triaptosis-Related Prognostic Model in Melanoma
Published 2025-06-01“…Key triaptosis-related genes and pathways were identified and incorporated into machine learning models to construct a prognostic signature. The TCGA-SKCM cohort served as the training dataset, and GEO datasets were used for validation.Results: A robust prognostic model based on triaptosis-associated signature (TAS) was established using the SurvivalSVM algorithm. …”
Get full text
Article -
4
Enhancing cybersecurity through autonomous knowledge graph construction by integrating heterogeneous data sources
Published 2025-04-01“…In our research, we construct a cybersecurity knowledge graph (CKG) autonomously using heterogeneous data sources. …”
Get full text
Article -
5
Facilitating Circular Transition in the Construction Industry: Optimizing a Prefabricated Construction Site Layout Using a Novel BIM-Integrated SLP-GA Model
Published 2024-09-01“…This study develops a BIM-based System Layout Planning-Genetic Algorithm (SLP-GA) model specifically tailored for prefabricated construction site optimisation. …”
Get full text
Article -
6
The energy reconstruction algorithm for high injection background
Published 2025-01-01Get full text
Article -
7
-
8
Integrated decision support system for optimizing time and cost trade offs in linear repetitive construction projects
Published 2025-06-01“…Each sub-task is systematically evaluated to identify the optimal construction method based on cost-time trade-offs, with scheduling constraints integrated into the fitness functions of both GA and PSO. …”
Get full text
Article -
9
-
10
Knowledge Integration and Analysis of Technological Innovation in Prefabricated Construction
Published 2025-01-01Get full text
Article -
11
Multi-Objective Robust Optimization Reconstruction Algorithm for Electrical Capacitance Tomography
Published 2025-04-01“…Qualitative and quantitative evaluation results demonstrate that the proposed method surpasses mainstream imaging algorithms, enhancing the automation level of the reconstruction process and image quality while exhibiting exceptional robustness. …”
Get full text
Article -
12
Assignment Technology Based on Improved Great Wall Construction Algorithm
Published 2025-02-01“…This paper presents an autonomous multi-UAV cooperative task allocation method based on an improved Great Wall Construction Algorithm. A model integrating battlefield environmental factors, 3D terrain data, and threat assessments is developed for optimized task allocation and trajectory planning. …”
Get full text
Article -
13
-
14
A Multi-Frequency Iterative Method for Reconstruction of Rough Surfaces Separating Two Penetrable Media
Published 2024-01-01Subjects: Get full text
Article -
15
Analysis method combining improved AE algorithm and signal reconstruction in mechanical faults
Published 2025-07-01“…Traditional diagnostic methods have shortcomings in accuracy and robustness.MethodsTherefore, the study integrates variational autoencoders with long short-term memory network models, enhances them using dropout methods, and proposes a hybrid diagnostic analysis model that combines improved autoencoder algorithms and signal reconstruction.ResultsThe experiment outcomes indicated that under the slow degradation mode of the bearing, the precision, recall, F1 score, and overall accuracy of the improved autoencoder model were 0.931, 0.933, 0.920, and 0.939, respectively, which were better than the pre-modified model. …”
Get full text
Article -
16
Can machine-learning algorithms improve upon classical palaeoenvironmental reconstruction models?
Published 2024-10-01Get full text
Article -
17
Sem-SLAM: Semantic-Integrated SLAM Approach for 3D Reconstruction
Published 2025-07-01“…Meanwhile, to deeply excavate the semantic information in images, a pre-trained frozen 2D segmentation algorithm is employed to extract semantic features, providing a powerful support for 3D environmental reconstruction. …”
Get full text
Article -
18
Network Security Perception System Integrating Improved CNN Algorithm and Improved GRU Algorithm
Published 2024-01-01“…Additionally, the gated recurrent unit is improved using an adaptive boosting algorithm. A novel network security-aware model integrating both methods is constructed. …”
Get full text
Article -
19
Phase diagram construction and prediction method based on machine learning algorithms
Published 2025-05-01Get full text
Article -
20
Robust Optimization for Integrated Construction Scheduling and Multiscale Resource Allocation
Published 2018-01-01“…This research investigates an integrated problem of construction scheduling and resource allocation. …”
Get full text
Article