Showing 1,101 - 1,120 results of 10,747 for search 'construction problems', query time: 0.21s Refine Results
  1. 1101
  2. 1102

    MODEL OF SEMANTIC INTEGRATION OF INFORMATION SYSTEMS PROPERTIES IN RELAY DATABASE REENGINEERING PROBLEMS by Oleg Avrunin, Oleksiy Vlasov, Valentin Filatov

    Published 2020-12-01
    “…On the basis of the analysis of structures and models of databases of information systems the general approach to construction of the universal technology focused on the decision of problems of management of heterogeneous information resources of computer systems is defined.…”
    Get full text
    Article
  3. 1103

    A Hybrid Approach for the Container Loading Problem for Enhancing the Dynamic Stability Representation by Ana María Montes-Franco, Juan Camilo Martinez-Franco, Alejandra Tabares, David Álvarez-Martínez

    Published 2025-03-01
    “…In the container loading problem (CLP), the construction of packing patterns is driven by the maximization of the volume occupied, and comprises several constraints such as loading feasibility, weight balance, cargo stability, operational safety, material handling, and the prevention of cargo damage during container shipping. …”
    Get full text
    Article
  4. 1104
  5. 1105

    On the Method for Solving the Problem of Ice Cover Deformation under an Arbitrary Moving Load by A. V. Galaburdin

    Published 2024-06-01
    “…The problem amounts to solving a system of two differential equations. …”
    Get full text
    Article
  6. 1106

    Problems and suggestions regarding professional practice for master of public health graduates in China by Weiquan ZENG, Yi LIN, Zhuoxuan LIANG, Huan YAO, Guanhao HE, Xiaomei DONG, Tao LIU, Xiaofeng LIANG, Wenjun MA

    Published 2025-01-01
    “…This article summarizes the existing problems in professional practice-based teaching for MPH students in China and proposes corresponding suggestions, aiming to provide a reference for improving the quality of practical teaching for MPH professionals in the country.…”
    Get full text
    Article
  7. 1107

    Artificial Intelligence Systems for Solving Problems of Agro­Industrial Complex Digitalization and Robotization by A. L. Ronzhin, A. I. Savel'ev

    Published 2022-06-01
    “…The digital transformation of agricultural technological processes is substantiated to be relevant in the context of the exacerbating global problems of food security, the agricultural business stagnation in the regions of the northern Non-Black Earth Region, as well as the ESG transformation of the economy.Research purpose To develop control algorithms for unmanned aerial vehicles (UAVs) based on numerical methods of machine learning to ensure the monitoring of the crops state and the improving of the production process planning and operational management.Materials and methods The following methodology was used: the original methods of machine learning, knowledge engineering and computer modeling for organizational and technological processes of technical objects’ life cycle in industry and products’ life cycle in the national economy,  as well as mathematical and algorithmic models, methods and prototypes of proactive automation tools for information, physical and energy interaction of heterogeneous robotic and cyber-physical complexes.Results and discussion Artificial intelligence systems were created for the photogrammetric processing of visible spectrum images and those taken with multispectral video cameras with the construction of orthophotomaps, digital elevation models. …”
    Get full text
    Article
  8. 1108
  9. 1109

    Development and investigation of parallel model of bee colony algorithms for cryptanalysis problem solving by Yury O Chernyshev, Alexander S Sergeev, Alexander N Ryazanov, Evgeny O. Dubrov

    Published 2017-03-01
    “…Theoretical estimates of time complexity of the bee colony algorithm are given as the key data. Besides, the problem solution is provided: to find the required smallest number of processors of the homogeneous parallel computing systems with distributed memory, and a uniform plan for the implementation of operators for them, for the cryptanalysis algorithm based on the constructed information-logical graph data-logical graph, and for the preset time. …”
    Get full text
    Article
  10. 1110

    The NFDA-Nonsmooth Feasible Directions Algorithm applied to construction of Pareto Fronts of Ridge and Lasso Regressions by W. P. Freire

    Published 2024-11-01
    “…We employ the NFDA-Nonsmooth Feasible Directions Algorithm devised for solving convex optimization problems to construct the Pareto fronts of Ridge and Lasso when regarded as bi-objective problems. …”
    Get full text
    Article
  11. 1111
  12. 1112

    Economic and technological assessment of construction of primary health care centres in rural areas of the Russian Federation by G. A. Trunin, A. F. Baranova

    Published 2025-06-01
    “…For the period from 2019–2021, 30 such objects are examined, the work progress is analysed, key problems of the construction delays in the region are identified, and violations during their construction are determined. …”
    Get full text
    Article
  13. 1113

    The Construction Path and Mode of Public Tourism Information Service System Based on the Perspective of Smart City by Hongyan Ma

    Published 2020-01-01
    “…This study combed the current status quo and problems of the public tourism information service system for qualitative analysis and summed up some common shortcomings and deficiencies. …”
    Get full text
    Article
  14. 1114

    Research on the Construction of Crossborder e-Commerce Logistics Service System Based on Machine Learning Algorithms by Jinbo Xu, Shibiao Mu

    Published 2022-01-01
    “…Finally, through simulation experiments, a series of data processing work such as data outlier cleaning, sliding window construction features of data variables, and training set and test set division are designed to convert regression prediction problems into classification problems to predict commodity demand. …”
    Get full text
    Article
  15. 1115

    MANAGEMENT AND REGULATION OF THE APPOINTMENT OF FORENSIC CONSTRUCTION INVESTIGATIONS AND THE INITIAL STAGES OF FORENSIC INQUIRY IN ARBITRATION PROCEEDINGS by A. Butyrin, E. B. Stativa

    Published 2014-09-01
    “…The paper highlights organizational and legal problems encountered at the stagesof appointment of a forensic construction investigation by an arbitration court, andacquisition of initial evidence for further analysis. …”
    Get full text
    Article
  16. 1116

    Creation of a hierarchical structure of design and survey works for complex infrastructure objects of capital construction by M. S. Perfiliev

    Published 2017-08-01
    “…The author has considered the issues of forming hierarchical structure of design and survey works for complex infrastructure objects of capital construction. The concept of works’ decomposition is disclosed. …”
    Get full text
    Article
  17. 1117
  18. 1118

    The Construction Path and Protection Measures of Wetland Park from the Perspective of National Participation in the New Era by Liping Li, Lifen Li

    Published 2022-01-01
    “…In order to study many problems, such as unreasonable wetland protection, development, and utilization, resulting in a large reduction of wetland area, and so on, with the rise of the construction and research upsurge of the municipal wetland park, a method of wetland park construction path and protection measures based on the perspective of the new era of national participation was proposed. …”
    Get full text
    Article
  19. 1119

    Specificity of the Application of the Fixed Price of the EPC-contract for the Construction of Nuclear Power Plant and Facilities Abroad by Yu. B. Ponomareva, M. M. Ishchenko

    Published 2024-11-01
    “…This study is devoted to approaches to pricing problems during the implementation of nuclear power plant construction projects abroad from the perspective of the nuclear industry’s aspiration to take the place of a global leader. …”
    Get full text
    Article
  20. 1120

    Optimizing the orientation of the open spaces and building constructions for cold climate based on sunshine in borujerd city

    Published 2016-09-01
    “…This study aimed to evaluate the climatic conditions for the establishment of Borujerd city in the design of buildings and streets of the city with an emphasis on radiant energy, an attempt to reduce problems related to cold climate is that in order to achieve this goal of data synoptic station in the city of Boroujerd a period of 23 years, including temperature, precipitation, relative humidity and other parameters as maximum, minimum and average is used. …”
    Get full text
    Article