Suggested Topics within your search.
Suggested Topics within your search.
-
1041
METHODS FOR THE ARRANGEMENT OF IMMERSED TUBE TUNNELS DURING CONSTRUCTION BASED ON STRUCTURALLY UNSTABLE SOILS
Published 2017-10-01“…Weak, structurally unstable soils, deep bedding of bedrock and high seismicity of the area will create serious problems in the construction and operation of such structures. …”
Get full text
Article -
1042
Investigation on the solidification mechanism and mechanical properties of basalt dust waste in soil subgrade construction
Published 2025-07-01“…In order to solve the problems of soil scarcity, and the properties of structural loose, poor grading, and poor cohesion of loess in the Huang River area during the construction of the Jibin intercity railway project, to improve the ecological and environmental benefits of the Jibin railway project, and to reduce cement consumption, this article first relies on engineering research to recycle waste stone powder from surrounding stone processing plants, and powder activation and particle size optimization based on self-developed processing system are conducted; Secondly, collect loess soil samples from the Huang River area, conduct soil sample screening and compaction tests, and obtain the particle size distribution and optimal moisture content of the loess; Introducing slag to regulate the activity of stone powder, based on the principle of alkali activation, the orthogonal experimental design method was used to study and compare the influence of alkali activator type, content, and silicon sodium content on the mechanical properties of cementitious materials prepared from basalt rock powder. …”
Get full text
Article -
1043
-
1044
Optimization of time and temperature of dam construction for thermal analysis of roller compacted concrete dam
Published 2023-06-01“…For the structure, hypothetical 50 cm layers are considered, each layer takes up 72 hours of analysis time. In general, the problem under analysis is analyzed 12 times. Each analysis is based on the start of the project from different months of the year to achieve the optimal constructing time based on the maximum temperature in the concrete of the dam and the stresses created by it by collecting the information and using the perceptron network algorithm. …”
Get full text
Article -
1045
Why the Evolution of Heritable Symbiosis Neither Enhances Nor Diminishes the Fitness of a Symbiont
Published 2022-01-01Get full text
Article -
1046
Exploring infrastructure project delays in a selected Eastern Cape Municipality, South Africa
Published 2025-04-01“…Conclusion: The study’s findings indicate that various reasons contribute to the KSD Municipality’s infrastructure project delays, making comprehensive solutions necessary to resolve these problems. Contribution: The study recommends mitigating delays in construction projects, including stakeholder engagement and collaboration, legal and contract management, practical monitoring and controlling, risk management and contingency planning and planning and resource allocation.…”
Get full text
Article -
1047
Organically Structured Control of Large-Scale Systems with Expanding Construction Based on State Observation
Published 2015-01-01“…This paper presents a new method on the problem of organically structured control based on state observation for a class of large-scale systems with expanding construction. …”
Get full text
Article -
1048
Algorithm for constructing asymptotics of periodic solutions in laser models with a rapidly oscillating delay
Published 2025-03-01“…A system averaged over fast oscillations and with a distributed delay is constructed. Critical cases in the problem of the stability of the equilibrium state are singled out. …”
Get full text
Article -
1049
Optimisation of decision making for construction projects of assembly buildings based on improved PSO algorithm
Published 2025-03-01“…A cutting-edge construction method called fitted construction allows for several parallel lines of work to speed up construction and enhance building quality. …”
Get full text
Article -
1050
Strongly connected dominating set construction algorithm balancing time delay and energy consumption
Published 2012-05-01“…To the asymmetry of link in wireless sensor networks,a problem about the strongly connected dominating tree with bounded transmission delay (SDTT) was put forward.The distributed strongly connected dominating tree (SCDT) algorithm was also proposed to construct strongly connected dominating set balancing transmission delay and energy consumption.Firstly,it constructed a maximal independent set (MIS) based on a unit disk graph,and then implemented the SCDT algorithm based on a double weighted and directed graph fulfilling the requirements of energy consumption and transmission delays simultaneously.The theoretical analysis and simulation results show that the presented algorithm can correctly solve the SDTT problem and construct the connected dominating sets(CDS)with constraints to form virtual backbone.…”
Get full text
Article -
1051
Construction and Simulation of a Strategic HR Decision Model Based on Recurrent Neural Network
Published 2022-01-01“…In this paper, RNN (Recurrent Neural Network) algorithm is used to conduct an in-depth analysis of HR strategic decision-making and an HR strategic decision model is constructed for simulation. The four evaluation dimensions of index screening are extracted, the generalized gray correlation analysis is applied to screen the initial selection indexes of HR strategic decision-making, and then the HR strategic decision-making index system of power supply enterprises is constructed. …”
Get full text
Article -
1052
Plasticity-based design and static performance of UT-type joint for construction error adaptation
Published 2025-07-01“…The problem of construction error is effectively solved using a unique structural design, and the plastic energy dissipation section is introduced based on the concept of plastic controllability. …”
Get full text
Article -
1053
LUNA: Loss-Construct Unsupervised Network Adjustment for Low-Dose CT Image Reconstruction
Published 2024-01-01“…Reconstructing low-dose CT imaging deals with handling the inherent noise within the data, which makes it a complex mathematical problem known as an ill-posed inverse problem. Recent attention has shifted towards deep learning-based techniques in CT image reconstruction. …”
Get full text
Article -
1054
Construction and analysis of localized responses for gradient damage models in a 1D setting
Published 2009-12-01“…We propose a method of construction of non homogeneous solutions to the problem of traction of a bar made of an elastic-damaging material whose softening behavior is regularized by a gradient damage model. …”
Get full text
Article -
1055
Construction technologies of polymorphic network environment based on codesign of domain-specific software/hardware
Published 2022-04-01“…The deeply integration of information network and economic society has brought the trend of symbiotic coexistence, dynamic concurrency, evolution and revolution of network modals.Firstly, in order to satisfy the requirements of vertical industry applications, a scheme of the polymorphic network element based on codesign of domain-specific hardware/software was proposed, the key technologies to construct polymorphic network environment were discussed as well.Then, to solve the resource competition problem between diversified network modals, a heterogeneous resource allocation and replacement method was proposed by integration of computing, storage and forwarding, which dynamically adjusted the resource-allocation strategy according to the traffic volume to realize the efficient resource utilization.Experimental results show that the proposed scheme can provide the basic platform support for the construction of polymorphic network by separation of technical systems and supporting environment.…”
Get full text
Article -
1056
SMRT Gate: A method for validation of synthetic constructs on Pacific Biosciences sequencing platforms
Published 2017-07-01“…Current DNA assembly methods are prone to sequence errors, requiring rigorous quality control (QC) to identify incorrect assemblies or synthesized constructs. Such errors can lead to misinterpretation of phenotypes. …”
Get full text
Article -
1057
Characterization The Factors Influencing Construction Productivity Using Index System and D-S Evidence Theory
Published 2024-04-01“…Based on the principle of Dempster-Schaffer evidence theory to make group decisions by constructing a comprehensive judgment matrix (to effectively gather the opinions of experts and solve the problem of conflicting opinions, then determine the weights of the indicators through the analytical hierarchy process,. …”
Get full text
Article -
1058
Elevation Error Prediction of Continuous Beam Cantilever Construction Phase Based on LS-SVM
Published 2025-06-01“…According to the construction of long-link continuous beam bridge, I choose field measured data as research samples and establish an elevation error prediction model by dealing samples, selecting the kernel function, selecting parameters, training, and predicting. …”
Get full text
Article -
1059
RESEARCH OF HEAT TREATMENT OF CEMENT USED IN CONSTRUCTION OF BRIDGE TRANSITION THROUGH KERCHEN STRAIT
Published 2018-05-01“…The article would be interesting and useful for engineering specialists, who work in real construction conditions, and for experts, who deal with the problem of high consumer concrete properties’ ensuring.…”
Get full text
Article -
1060
Balancing economical and environmental trade-off in modular construction yard planning: Models and properties
Published 2023-12-01“…This study investigates an integrated yard planning and module transportation problem in modular integrated construction (MiC). …”
Get full text
Article