Showing 1,021 - 1,040 results of 10,747 for search 'construction problems', query time: 0.17s Refine Results
  1. 1021

    Construction and Overall Protection of Ecological and Marine Cultural Composite Landscape Network in Quanzhou, Fujian by Dongfang LU, Yaru ZHENG, Tianteng HAN, Shunhe CHEN

    Published 2025-07-01
    “…These factors collectively contribute to the vulnerability of marine ecosystems, posing numerous challenges for the protection and construction of coastal cities in terms of ecology, culture, and environment. …”
    Get full text
    Article
  2. 1022

    Construction of Binary Locally Repairable Codes with Nonuniform Locality and Availability Using Combinatorial Designs by Yu Zhang, Xiangqiong Zeng

    Published 2025-03-01
    “…We also address open problems in the literature, including constructions where <inline-formula><math xmlns="http://www.w3.org/1998/Math/MathML" display="inline"><semantics><mrow><mi>r</mi><mo>∤</mo><mi>k</mi></mrow></semantics></math></inline-formula>, and demonstrate that our constructions encompass or outperform several prior works.…”
    Get full text
    Article
  3. 1023
  4. 1024

    Three-Dimensional Visualization Algorithm Simulation of Construction Management Based on GIS and VR Technology by Shuhong Xu

    Published 2021-01-01
    “…Based on the three-dimensional geographic information system and desktop drawing software AutoCAD, this paper takes the two-dimensional line drawing (DLG) of a residential district as the base map, expounds the design process of the three-dimensional simulation model of the urban community from the aspects of map preprocessing, building simulation model construction, texture mapping, and virtual visualization, and discusses the problems encountered in it. …”
    Get full text
    Article
  5. 1025

    Aspects of the Interpretation and Implementation of Expert’s Rights in the Appointment and Production of Forensic Construction and Technical Examination by A. Yu. Butyrin, E. B. Stativa

    Published 2020-07-01
    “…Basing on the analysis of practice for the appointment and conduct of forensic construction and technical examinations, the authors of the article have examined the organizational and legal problems encountered by an expert when familiarizing himself with the case materials and studying them; applicating for additional materials; involving another expert in the production of an examination, as well as in the exercising other expert’s rights provided by the legislation on forensic examination.The article discusses forensic situations when it is often allowed either an unjustifiably broad interpretation of the provisions of the law in this part, or an unreasonably narrow, and sometimes incorrect, in the authors’ opinion, their interpretation. …”
    Get full text
    Article
  6. 1026

    Production of Mycoblock from the Mycelium of the Fungus Pleurotus ostreatus for Use as Sustainable Construction Materials by Digafe Alemu, Mesfin Tafesse, Yohannes Gudetta Deressa

    Published 2022-01-01
    “…However, most industrially manufactured products are not eco-friendly, costly, and locally unavailable. To solve these problems, using and enhancing locally available biomaterials are the key option. …”
    Get full text
    Article
  7. 1027

    Digital security risk identification and model construction of smart city based on deep learning by Zhilei Zhao

    Published 2025-07-01
    “…Abstract In view of the network security risks caused by the integration of the Industrial Internet of Things (IIoT) in the construction of smart cities, this research proposes a digital security identification model (DL-DSIM) based on deep learning, which aims to improve the data transmission efficiency and system security in the smart city environment. …”
    Get full text
    Article
  8. 1028
  9. 1029

    Application of Six Sigma methodology and RFID technology in human resource management of construction projects by Alireza Hashemian, Samaneh Jadali, Amirhossein Hajibabaei

    Published 2019-11-01
    “…In this regard, by combining two different branches of six sigma, which is an optimization method, and six sigma technology, a practical method was presented to reduce wasted times and manage them, so that one of the issues and problems in construction workshops was optimized and In fact, time management should be addressed in human resources. …”
    Get full text
    Article
  10. 1030

    EVALUATION OF CONSTRUCTION MATERIALS ON PROJECT SITES IN FEDERAL CAPITAL TERRITORY, F.C.T, ABUJA by Micheal, F., Mahmoud, A., Ishaya, K.S, Kpalo, S.Y

    Published 2023-11-01
    “…Poor construction materials in construction projects sites has many issues which contribute to it such as: wastage of construction materials, and improper handling on site. …”
    Get full text
    Article
  11. 1031

    Construction of a Class of Higher-Order Iterative Techniques and its Convergence in Banach Spaces by Sattam Alharbi, Gagan Deep, Ramandeep Behl, Abdulaziz Mutlaq Alotaibi

    Published 2025-10-01
    “…This approach provides us with the flexibility to construct new iterative techniques with the same level of convergence. …”
    Get full text
    Article
  12. 1032
  13. 1033

    Ecological network construction and land degradation risk identification in the Yellow River source area by Haoxiang Zhang, Qian Song, Shiru Wang, Jianyun Zhao, Wenming Gao

    Published 2025-07-01
    “…The construction of ecological and risk networks is indispensable for maintaining ecological processes and sustaining ecological harmony. …”
    Get full text
    Article
  14. 1034

    Construction of Knowledge Graph for Marine Diesel Engine Faults Based on Deep Learning Methods by Xiaohe Tian, Huibing Gan, Yanlin Liu

    Published 2025-03-01
    “…., expert systems, traditional machine learning) can hardly cope with the complex failure modes and dynamic operation environment due to the problems of relying on artificial features and insufficient generalization ability. …”
    Get full text
    Article
  15. 1035

    Research on Construction Method of Distribution Network Data Pool Integrating Block Chain Concept by Qian ZHAO, Xiao ZHANG, Hong WANG, Rui MA, Tianhua WANG, Yuan ZHANG, Yanmin WANG

    Published 2019-12-01
    “…Due to the lack of a unified data management platform, the data application and management work of the development department has many problems, such as heavy workload, high repeatability and poor consistency. …”
    Get full text
    Article
  16. 1036

    PHYSICAL ACTIVITY AND POSTURAL STABILITY AMONG INDONESIAN CONSTRUCTION WORKERS: A PRELIMINARY STUDY by Siti Ainun Marufa, Nurul Aini Rahmawati, Ega Halima Ramdini, Firza Nadia Putri

    Published 2024-03-01
    “…Aims: This preliminary study aims to assess the relationship between physical activity and postural stability among Indonesian construction workers. Methods: A total of 118 healthy male construction workers without health problems were recruited for this study. …”
    Get full text
    Article
  17. 1037

    An Integrated Optimization Method for Resource-Constrained Schedule Compression Under Uncertainty in Construction Projects by Firas Takleef, Omar Ayadi, Faouzi Masmoudi

    Published 2025-04-01
    “…The most interesting aspect of the proposed method is that it suggests addressing problems with resource planning and project scheduling simultaneously under uncertainty. …”
    Get full text
    Article
  18. 1038

    INTRODUCTION OF INNOVATIVE TECHNOLOGIES MANAGEMENT by L. Karapetyan, I. Kogotkova

    Published 2017-03-01
    “…The article is devoted to technological innovation, the problems of their implementation at the sectoral level and the level of construction organizations, the analysis of technological innovation today, а comparison with foreign experience innovation.…”
    Get full text
    Article
  19. 1039
  20. 1040

    Data Augmentation Approaches for Estimating Curtain Wall Construction Duration in High-Rise Buildings by Sang-Jun Park, Jin-Bin Im, Hye-Soon Yoon, Ju-Hyung Kim

    Published 2025-02-01
    “…In cases of high-rise buildings exceeding 200 m, insufficient data commonly arise from the rarity of such projects, leading to a rough estimation of construction duration. Therefore, in this study, oversampling and data augmentation techniques derived from engineering principles, such as parametric optimization and data imbalance problems, are explored for curtain wall construction for high-rise buildings. …”
    Get full text
    Article