Search alternatives:
method » methods (Expand Search)
Showing 321 - 340 results of 1,366 for search 'Fault three analysis method', query time: 0.20s Refine Results
  1. 321
  2. 322
  3. 323
  4. 324
  5. 325
  6. 326

    Reliability Assessment for a Safety-Related Digital Reactor Protection System Using Event-Tree/Fault-Tree (ET/FT) Method by Qingzhu Liang, Mingxing Liu, Peng Xiao, Yun Guo, Jun Xiao, Changhong Peng

    Published 2020-01-01
    “…The aim of this study is to verify if the reliability of a digital four-channel RPS under the design phase satisfies the specified target and to identify the weakness of system design and potential solutions for system reliability improvement. The event-tree/fault-tree (ET/FT), which is the method used in the current probabilistic safety assessment (PSA) framework of nuclear power plants (NPPs), was adopted to developed reliability modeling for the RPS with the Top Events defined as the system failure to generate reactor trip signal and the system generating spurious trip signal. …”
    Get full text
    Article
  7. 327
  8. 328
  9. 329
  10. 330
  11. 331
  12. 332
  13. 333
  14. 334

    Management plan of geological hazard threats in the fault zone of adjacent open-pit mines by Guangwei LIU, Junxiong TU, Xianshuai MA, Yong YAO, Liang WANG, Meiling ZHAO

    Published 2025-02-01
    “…The management plan specifies the scope of operation of the “overall excavation and backfilling” management method, and designs the shape of the clean-up work gang and the slope of the internal discharge site when the management is completed, which can completely eliminate the hidden geological hazards and release 9 318 300 m3 of internal discharge space in the West Second Open Pit Mine and 7 646 900 m3 of internal discharge space in the Zhemei open-pit mine Mine, so that the two mines can continue to achieve complete internal drainage. …”
    Get full text
    Article
  15. 335
  16. 336
  17. 337
  18. 338
  19. 339
  20. 340