Showing 1 - 20 results of 117 for search 'China Railway High-speed', query time: 0.10s Refine Results
  1. 1

    Research on expansion joint for high-speed railway long-span bridges in China by Hui Guo, Jinzhou Jiang, Suoting Hu, Chun Yang, Qiqi Xiang, Kou Luo, Xinxin Zhao, Bing Li, Ziquan Yan, Liubin Niu, Jianye Zhao

    Published 2025-02-01
    “…The main aim of this study is to present analysis of recent developments in the research and application of BEJs in high-speed railway (HSR) long-span bridges in China, and to propose a performance-based integral design method for BEJs used with REJs, from both theoretical and engineering perspectives. …”
    Get full text
    Article
  2. 2

    Ticket Fare Optimization for China’s High-Speed Railway Based on Passenger Choice Behavior by Jinzi Zheng, Jun Liu, David B. Clarke

    Published 2017-01-01
    “…Although China’s high-speed railway (HSR) is maturing after more than ten years of construction and development, the load factor and revenue of HSR could still be improved by optimizing the ticket fare structure. …”
    Get full text
    Article
  3. 3
  4. 4

    Earthquake Influence on the Rail Irregularity on High-Speed Railway Bridge by Zhipeng Lai, Xin Kang, Lizhong Jiang, Wangbao Zhou, Yulin Feng, Yuntai Zhang, Jian Yu, Leixin Nie

    Published 2020-01-01
    “…Afterward, the effects of earthquake intensity, soil site, and duration on the rail irregularity of a Chinese typical high-speed railway bridge were investigated. For this purpose, a finite element model was established and validated by the shaking table test of a 1/12-scaled high-speed railway bridge experimental specimen. …”
    Get full text
    Article
  5. 5
  6. 6

    Optimization Based High-Speed Railway Train Rescheduling with Speed Restriction by Li Wang, Wenting Mo, Yong Qin, Fei Dou, Limin Jia

    Published 2014-01-01
    “…The proposed rescheduling model is simulated on the busiest part of Beijing to Shanghai high-speed railway in China. The case study shows the significance of rerouting strategy and utilization of the railway network capacity in case of speed restriction.…”
    Get full text
    Article
  7. 7
  8. 8
  9. 9
  10. 10
  11. 11
  12. 12
  13. 13
  14. 14
  15. 15

    Investigation of Shadowing Effects in Typical Propagation Scenarios for High-Speed Railway at 2350 MHz by Liu Liu, Cheng Tao, David W. Matolak, Tao Zhou, Houjin Chen

    Published 2016-01-01
    “…Based on realistic measurements in China, shadowing characteristics at the frequency of 2350 MHz were investigated in typical High-Speed Railway environments. …”
    Get full text
    Article
  16. 16

    A Semiempirical MIMO Channel Model in Obstructed Viaduct Scenarios on High-Speed Railway by Tao Zhou, Cheng Tao, Liu Liu, Zhenhui Tan

    Published 2014-01-01
    “…A semiempirical multiple-input multiple-output (MIMO) channel model is proposed for high-speed railway (HSR) viaduct scenarios. The proposed MIMO model is based on the combination of realistic single-input single-output (SISO) channel measurement results and a theoretical geometry-based stochastic model (GBSM). …”
    Get full text
    Article
  17. 17
  18. 18

    Reliability Calibration of Tower Members in Transmission Line System Crossing High-Speed Railway by Yunfen Feng, Shufei Gao, Zeyu Feng

    Published 2022-01-01
    “…Due to the rapid development of high-speed railway in China, transmission line systems across the high-speed railway system have become more prevalent in recent years, which highlights the importance of reliable design for systems. …”
    Get full text
    Article
  19. 19
  20. 20