Showing 1 - 4 results of 4 for search '"solution ability"', query time: 0.06s Refine Results
  1. 1

    Fuzzy Group Decision Making for Multiobjective Problems: Tradeoff between Consensus and Robustness by Jian Xiong, Xu Tan, Ke-wei Yang, Ying-wu Chen

    Published 2013-01-01
    “…The former is used to reflect the acceptable degree of a solution by the decision making group, while the latter indicates a solution's ability to cope with any change on preferences. …”
    Get full text
    Article
  2. 2

    Resource Scheduling with Uncertain Execution Time in Cloud Computing by LI Cheng-yan, CAO Ke-han, FENG Shi-xiang, SUN Wei

    Published 2019-02-01
    “…For the problem of cloud computing resource scheduling, based on the fuzzy programming theory, a fuzzy cloud resource scheduling model under timecost constraint was set up, the uncertain execution time of tasks is represented by the triangular fuzzy number, and the target is to minimize the average value and standard deviation of the evaluation function An improved chaotic ant colony algorithm was proposed to solve the model, the elitist strategy is introduced to optimize the pheromone updating, a chaotic mapping with infinite folding times is used for chaotic search, and the adaptive chaotic disturbance mechanism is designed to enhance the global searching ability The model and algorithm were tested on the Cloudsim platform, the reliability of the model was proved, and the experimental results showed that the proposed algorithm had better performance in convergence speed, solution ability and load balance…”
    Get full text
    Article
  3. 3

    Inverse Analysis of Thermal Parameters of Arch Dam Concrete Based on Walrus Optimization Algorithm by Youle Wang, Zhengjian Miao, Rui Song, Junchi Zhou, Yuheng Pan, Feng Wang

    Published 2025-02-01
    “…We bring the inversion results into different dam sections to calculate the temperature field during construction, which effectively verifies the efficient solution ability of the WaOA for the inverse analysis of concrete thermal parameters under complex engineering backgrounds.…”
    Get full text
    Article
  4. 4

    A Flow Shop Scheduling Method Based on Dual BP Neural Networks with Multi-Layer Topology Feature Parameters by Hui Mu, Zinuo Wang, Jiaqi Chen, Guoqiang Zhang, Shaocun Wang, Fuqiang Zhang

    Published 2024-09-01
    “…The numerical simulation results show that with the increase in problem scale, the solution ability of the traditional method gradually deteriorates, while the dual BP neural network has a stable performance and fast computational time.…”
    Get full text
    Article