Investigating the Partial Replacement of Crushed Run Rock with Reclaimed Asphalt Pavement in Base Course.
Overlay and maintenance resolve medium distress, but reconstruction may be feasible and economical while Asphalt pavement is badly deteriorated with time and traffic. This requires the removal of existing pavement surfaces. Recycling such construction waste has benefited from an economic to sustaina...
Saved in:
Main Author: | Ninyesiga, Bruno |
---|---|
Format: | Thesis |
Language: | English |
Published: |
Kabale University
2025
|
Subjects: | |
Online Access: | http://hdl.handle.net/20.500.12493/2779 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Investigating the Effect of Wood Ash–Lime Blend in the Stabilization of Reclaimed Asphalt Pavement for Road Construction.
by: Byamugisha, Mark
Published: (2025) -
Assessing the Effect of Groundnut Shell Ash-Lime Stabilization of Reclaimed Asphalt Pavement for Road Construction.
by: Tumusiime, Innocent
Published: (2025) -
Investigating the Suitability of Partial Replacement of Basalt with Scoria as a Base Course Material for a Flexible Pavement.
by: Wambei, Allan
Published: (2024) -
Investigating Use of Crushed Glass as Partial Replacement of Sand to Improve Finish Mortar Strength.
by: Ashaba, Dennis
Published: (2025) -
Assessing the Use of Crushed Rock Aggregate and Carbon Black for Laterite Soil Stabilization in Road Construction.
by: Turyamureeba, Emmanuel
Published: (2024)