Design of a Waste Water Treatment System for Kampala International University-Western Campus.

This project deals with the design of a wastewater treatment system for Kampala International University, Western campus. The university premises have the existing traditional systems which according to research will not be sufficient to cater for the growing population in the long run. By consideri...

Full description

Saved in:
Bibliographic Details
Main Author: Tayebwa, Gift
Format: Thesis
Published: Kabale University 2023
Online Access:http://hdl.handle.net/20.500.12493/1306
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1800403074032861184
author Tayebwa, Gift
author_facet Tayebwa, Gift
author_sort Tayebwa, Gift
collection KAB-DR
description This project deals with the design of a wastewater treatment system for Kampala International University, Western campus. The university premises have the existing traditional systems which according to research will not be sufficient to cater for the growing population in the long run. By considering the topography of the area, a gravity collection system was considered for the design and using design equations and the data obtained from the field, to obtain the flow of each pipe section, velocity, slope pipe sizes, residual head and head losses the pipe hydraulics were obtained. The invert levels for the manholes were also calculated and used to obtain the profile of the system. Considering different factors, a convenient treatment system was chosen and that is the use of wastes stabilization ponds. The wastewater discharged from the campus was picked and tested to obtain the most needed parameters for the design. And also, An EIA is shown expressing the different problems the project may have to the environment and the mitigation measures of each problem also shown Waste stabilization ponds contains mainly three ponds namely anaerobic, facultative and maturation pond and the design equations used are according to Mara and Pearson (1986). The anaerobic pond was designed basing on volumetric loading and the pond depth is 3.5m, pond area is 85.62m2, pond volume is 342.47m3 and a retention time of 1.2 days. The facultative pond is designed basing on surface loading which is dependent on temperature (200C) and the pond depth is 2m, pond area is 1467m2, pond volume is 2934m3 and retention time is 110.3 days. The maturation pond is designed basing on Marais (1974) for fecal coliform removal. The pond depth is 1.5m, pond area is 2844.7m2, pond volume is 4267.05m3 and the retention time is 15days. Conclusions and recommendations were also shown in this report about the different aspects of the system.
format Thesis
id oai:idr.kab.ac.ug:20.500.12493-1306
institution KAB-DR
publishDate 2023
publisher Kabale University
record_format dspace
spelling oai:idr.kab.ac.ug:20.500.12493-13062024-01-30T07:47:17Z Design of a Waste Water Treatment System for Kampala International University-Western Campus. Tayebwa, Gift This project deals with the design of a wastewater treatment system for Kampala International University, Western campus. The university premises have the existing traditional systems which according to research will not be sufficient to cater for the growing population in the long run. By considering the topography of the area, a gravity collection system was considered for the design and using design equations and the data obtained from the field, to obtain the flow of each pipe section, velocity, slope pipe sizes, residual head and head losses the pipe hydraulics were obtained. The invert levels for the manholes were also calculated and used to obtain the profile of the system. Considering different factors, a convenient treatment system was chosen and that is the use of wastes stabilization ponds. The wastewater discharged from the campus was picked and tested to obtain the most needed parameters for the design. And also, An EIA is shown expressing the different problems the project may have to the environment and the mitigation measures of each problem also shown Waste stabilization ponds contains mainly three ponds namely anaerobic, facultative and maturation pond and the design equations used are according to Mara and Pearson (1986). The anaerobic pond was designed basing on volumetric loading and the pond depth is 3.5m, pond area is 85.62m2, pond volume is 342.47m3 and a retention time of 1.2 days. The facultative pond is designed basing on surface loading which is dependent on temperature (200C) and the pond depth is 2m, pond area is 1467m2, pond volume is 2934m3 and retention time is 110.3 days. The maturation pond is designed basing on Marais (1974) for fecal coliform removal. The pond depth is 1.5m, pond area is 2844.7m2, pond volume is 4267.05m3 and the retention time is 15days. Conclusions and recommendations were also shown in this report about the different aspects of the system. 2023-07-11T05:47:51Z 2023-07-11T05:47:51Z 2021 Thesis Tayebwa, Gift (2021). Design of a Waste Water Treatment System for Kampala International University-Western Campus. Kabale: Kabale University. http://hdl.handle.net/20.500.12493/1306 application/pdf Kabale University
spellingShingle Tayebwa, Gift
Design of a Waste Water Treatment System for Kampala International University-Western Campus.
title Design of a Waste Water Treatment System for Kampala International University-Western Campus.
title_full Design of a Waste Water Treatment System for Kampala International University-Western Campus.
title_fullStr Design of a Waste Water Treatment System for Kampala International University-Western Campus.
title_full_unstemmed Design of a Waste Water Treatment System for Kampala International University-Western Campus.
title_short Design of a Waste Water Treatment System for Kampala International University-Western Campus.
title_sort design of a waste water treatment system for kampala international university western campus
url http://hdl.handle.net/20.500.12493/1306
work_keys_str_mv AT tayebwagift designofawastewatertreatmentsystemforkampalainternationaluniversitywesterncampus