Lateral bearing characteristics of subsea wellhead assembly in the hydrate trial production engineering

ABSTRACT: Conductor and suction anchor are the key equipment providing bearing capacity in the field of deep-water drilling or offshore engineering, which have the advantages of high operation efficiency and short construction period. In order to drill a horizontal well in the shallow hydrate reserv...

Full description

Saved in:
Bibliographic Details
Main Authors: Jing Zeng, Wen-wei Xie, Bei-bei Kou, Jing-an Lu, Xing-chen Li, De-jun Cai, Hao-xian Shi, Ke-wei Zhang, Hua-qing Liu, Jin Li, Bo Li
Format: Article
Language:English
Published: KeAi Communications Co., Ltd. 2023-07-01
Series:China Geology
Subjects:
Online Access:http://www.sciencedirect.com/science/article/pii/S2096519223014489
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1849426157182648320
author Jing Zeng
Wen-wei Xie
Bei-bei Kou
Jing-an Lu
Xing-chen Li
De-jun Cai
Hao-xian Shi
Ke-wei Zhang
Hua-qing Liu
Jin Li
Bo Li
author_facet Jing Zeng
Wen-wei Xie
Bei-bei Kou
Jing-an Lu
Xing-chen Li
De-jun Cai
Hao-xian Shi
Ke-wei Zhang
Hua-qing Liu
Jin Li
Bo Li
author_sort Jing Zeng
collection DOAJ
description ABSTRACT: Conductor and suction anchor are the key equipment providing bearing capacity in the field of deep-water drilling or offshore engineering, which have the advantages of high operation efficiency and short construction period. In order to drill a horizontal well in the shallow hydrate reservoir in the deep water, the suction anchor wellhead assembly is employed to undertake the main vertical bearing capacity in the second round of hydrate trial production project, so as to reduce the conductor running depth and heighten the kick-off point position. However, the deformation law of the deep-water suction anchor wellhead assembly under the moving load of the riser is not clear, and it is necessary to understand the lateral bearing characteristics to guide the design of its structural scheme. Based on 3D solid finite element method, the solid finite element model of the suction anchor wellhead assembly is established. In the model, the seabed soil is divided into seven layers, the contact between the wellhead assembly and the soil is simulated, and the vertical load and bending moment are applied to the wellhead node to simulate the riser movement when working in the deep water. The lateral bearing stability of conventional wellhead assembly and suction anchor wellhead assembly under the influence of wellhead load is discussed. The analysis results show that the bending moment is the main factor affecting the lateral deformation of the wellhead string; the anti-bending performance from increasing the outer conductor diameter is better than that from increasing the conductor wall thickness; for the subsea wellhead, the suction anchor obviously improves the lateral bearing capacity and reduces the lateral deformation. The conduct of the suction anchor wellhead assembly still needs to be lowered to a certain depth that below the maximum disturbed depth to ensure the lateral bearing stability, Thus, a method for the minimum conductor running depth for the suction anchor wellhead assembly is developed. The field implementations show that compared with the first round of hydrate trial production project, the conductor running depth is increased by 9.42 m, and there is no risk of wellhead overturning during the trial production. The method for determining the minimum conductor running depth in this paper is feasible and will still play an important role in the subsequent hydrate exploration and development.©2023 China Geology Editorial Office.
format Article
id doaj-art-ffdf53c468364dffaf6dc7c3ffcb7350
institution Kabale University
issn 2589-9430
language English
publishDate 2023-07-01
publisher KeAi Communications Co., Ltd.
record_format Article
series China Geology
spelling doaj-art-ffdf53c468364dffaf6dc7c3ffcb73502025-08-20T03:29:31ZengKeAi Communications Co., Ltd.China Geology2589-94302023-07-016345546510.31035/cg2022057Lateral bearing characteristics of subsea wellhead assembly in the hydrate trial production engineeringJing Zeng0Wen-wei Xie1Bei-bei Kou2Jing-an Lu3Xing-chen Li4De-jun Cai5Hao-xian Shi6Ke-wei Zhang7Hua-qing Liu8Jin Li9Bo Li10Guangzhou Marine Geological Survey, China Geological Survey, Ministry of Natural Resources, Guangzhou 510075, China; Southern Marine Science and Engineering Guangdong Laboratory (Guangzhou), Guangzhou 511458, China; National Engineering Research Center of Gas Hydrate Exploration and Development, China Geological Survey, Ministry of Natural Resources, Guangzhou 510075, China; First author: E-mail address: zeng_jing91@163.com (Zeng Jing).Guangzhou Marine Geological Survey, China Geological Survey, Ministry of Natural Resources, Guangzhou 510075, China; Southern Marine Science and Engineering Guangdong Laboratory (Guangzhou), Guangzhou 511458, China; National Engineering Research Center of Gas Hydrate Exploration and Development, China Geological Survey, Ministry of Natural Resources, Guangzhou 510075, ChinaGuangzhou Marine Geological Survey, China Geological Survey, Ministry of Natural Resources, Guangzhou 510075, China; Southern Marine Science and Engineering Guangdong Laboratory (Guangzhou), Guangzhou 511458, China; National Engineering Research Center of Gas Hydrate Exploration and Development, China Geological Survey, Ministry of Natural Resources, Guangzhou 510075, China; Corresponding author: E-mail address: koubb0303@163.com (Kou Bei-bei).Guangzhou Marine Geological Survey, China Geological Survey, Ministry of Natural Resources, Guangzhou 510075, China; Southern Marine Science and Engineering Guangdong Laboratory (Guangzhou), Guangzhou 511458, China; National Engineering Research Center of Gas Hydrate Exploration and Development, China Geological Survey, Ministry of Natural Resources, Guangzhou 510075, ChinaGuangzhou Marine Geological Survey, China Geological Survey, Ministry of Natural Resources, Guangzhou 510075, China; Southern Marine Science and Engineering Guangdong Laboratory (Guangzhou), Guangzhou 511458, China; National Engineering Research Center of Gas Hydrate Exploration and Development, China Geological Survey, Ministry of Natural Resources, Guangzhou 510075, ChinaDrilling Engineering Division, Offshore Engineering Company Limited, CNPC, Tianjin 300280, ChinaGuangzhou Marine Geological Survey, China Geological Survey, Ministry of Natural Resources, Guangzhou 510075, China; Southern Marine Science and Engineering Guangdong Laboratory (Guangzhou), Guangzhou 511458, China; National Engineering Research Center of Gas Hydrate Exploration and Development, China Geological Survey, Ministry of Natural Resources, Guangzhou 510075, ChinaGuangzhou Marine Geological Survey, China Geological Survey, Ministry of Natural Resources, Guangzhou 510075, China; Southern Marine Science and Engineering Guangdong Laboratory (Guangzhou), Guangzhou 511458, China; National Engineering Research Center of Gas Hydrate Exploration and Development, China Geological Survey, Ministry of Natural Resources, Guangzhou 510075, ChinaDrilling Engineering Division, Offshore Engineering Company Limited, CNPC, Tianjin 300280, ChinaGuangzhou Marine Geological Survey, China Geological Survey, Ministry of Natural Resources, Guangzhou 510075, China; Southern Marine Science and Engineering Guangdong Laboratory (Guangzhou), Guangzhou 511458, China; National Engineering Research Center of Gas Hydrate Exploration and Development, China Geological Survey, Ministry of Natural Resources, Guangzhou 510075, ChinaGuangzhou Marine Geological Survey, China Geological Survey, Ministry of Natural Resources, Guangzhou 510075, China; Southern Marine Science and Engineering Guangdong Laboratory (Guangzhou), Guangzhou 511458, China; National Engineering Research Center of Gas Hydrate Exploration and Development, China Geological Survey, Ministry of Natural Resources, Guangzhou 510075, ChinaABSTRACT: Conductor and suction anchor are the key equipment providing bearing capacity in the field of deep-water drilling or offshore engineering, which have the advantages of high operation efficiency and short construction period. In order to drill a horizontal well in the shallow hydrate reservoir in the deep water, the suction anchor wellhead assembly is employed to undertake the main vertical bearing capacity in the second round of hydrate trial production project, so as to reduce the conductor running depth and heighten the kick-off point position. However, the deformation law of the deep-water suction anchor wellhead assembly under the moving load of the riser is not clear, and it is necessary to understand the lateral bearing characteristics to guide the design of its structural scheme. Based on 3D solid finite element method, the solid finite element model of the suction anchor wellhead assembly is established. In the model, the seabed soil is divided into seven layers, the contact between the wellhead assembly and the soil is simulated, and the vertical load and bending moment are applied to the wellhead node to simulate the riser movement when working in the deep water. The lateral bearing stability of conventional wellhead assembly and suction anchor wellhead assembly under the influence of wellhead load is discussed. The analysis results show that the bending moment is the main factor affecting the lateral deformation of the wellhead string; the anti-bending performance from increasing the outer conductor diameter is better than that from increasing the conductor wall thickness; for the subsea wellhead, the suction anchor obviously improves the lateral bearing capacity and reduces the lateral deformation. The conduct of the suction anchor wellhead assembly still needs to be lowered to a certain depth that below the maximum disturbed depth to ensure the lateral bearing stability, Thus, a method for the minimum conductor running depth for the suction anchor wellhead assembly is developed. The field implementations show that compared with the first round of hydrate trial production project, the conductor running depth is increased by 9.42 m, and there is no risk of wellhead overturning during the trial production. The method for determining the minimum conductor running depth in this paper is feasible and will still play an important role in the subsequent hydrate exploration and development.©2023 China Geology Editorial Office.http://www.sciencedirect.com/science/article/pii/S2096519223014489Natural gas hydrateDeep-waterSubsea wellheadSuction anchorWellhead stability3D solid finite element method
spellingShingle Jing Zeng
Wen-wei Xie
Bei-bei Kou
Jing-an Lu
Xing-chen Li
De-jun Cai
Hao-xian Shi
Ke-wei Zhang
Hua-qing Liu
Jin Li
Bo Li
Lateral bearing characteristics of subsea wellhead assembly in the hydrate trial production engineering
China Geology
Natural gas hydrate
Deep-water
Subsea wellhead
Suction anchor
Wellhead stability
3D solid finite element method
title Lateral bearing characteristics of subsea wellhead assembly in the hydrate trial production engineering
title_full Lateral bearing characteristics of subsea wellhead assembly in the hydrate trial production engineering
title_fullStr Lateral bearing characteristics of subsea wellhead assembly in the hydrate trial production engineering
title_full_unstemmed Lateral bearing characteristics of subsea wellhead assembly in the hydrate trial production engineering
title_short Lateral bearing characteristics of subsea wellhead assembly in the hydrate trial production engineering
title_sort lateral bearing characteristics of subsea wellhead assembly in the hydrate trial production engineering
topic Natural gas hydrate
Deep-water
Subsea wellhead
Suction anchor
Wellhead stability
3D solid finite element method
url http://www.sciencedirect.com/science/article/pii/S2096519223014489
work_keys_str_mv AT jingzeng lateralbearingcharacteristicsofsubseawellheadassemblyinthehydratetrialproductionengineering
AT wenweixie lateralbearingcharacteristicsofsubseawellheadassemblyinthehydratetrialproductionengineering
AT beibeikou lateralbearingcharacteristicsofsubseawellheadassemblyinthehydratetrialproductionengineering
AT jinganlu lateralbearingcharacteristicsofsubseawellheadassemblyinthehydratetrialproductionengineering
AT xingchenli lateralbearingcharacteristicsofsubseawellheadassemblyinthehydratetrialproductionengineering
AT dejuncai lateralbearingcharacteristicsofsubseawellheadassemblyinthehydratetrialproductionengineering
AT haoxianshi lateralbearingcharacteristicsofsubseawellheadassemblyinthehydratetrialproductionengineering
AT keweizhang lateralbearingcharacteristicsofsubseawellheadassemblyinthehydratetrialproductionengineering
AT huaqingliu lateralbearingcharacteristicsofsubseawellheadassemblyinthehydratetrialproductionengineering
AT jinli lateralbearingcharacteristicsofsubseawellheadassemblyinthehydratetrialproductionengineering
AT boli lateralbearingcharacteristicsofsubseawellheadassemblyinthehydratetrialproductionengineering