Engineering Innovation of a Length of Nearly 3300m large Diameter Pipeline Installed by HDD
The Yangtze River Crossing Project, which is part of the Chinese gas pipeline trunk network and aims to transmit the natural gas to the Yangtze River Delta area, sets up a record for the length of Horizontal Directional Drilling (HDD) in the world. The term of pipeline installed is 3300m, and the di...
Saved in:
| Main Authors: | Li Guohui, Ma Xiaocheng, Yang Chunling |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Universidad Nacional de Colombia
2016-01-01
|
| Series: | Earth Sciences Research Journal |
| Subjects: | |
| Online Access: | https://revistas.unal.edu.co/index.php/esrj/article/view/54504 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Hydromechanical Deep Drawing Process and Optimization of Fender Based on FEM
by: LIU Xiao-jing, et al.
Published: (2018-02-01) -
Critical technical parameters of large-diameter multi-stage casing drilling for mine rescue
by: Chao XU, et al.
Published: (2025-04-01) -
A New Algorithm for Computing the Distance and the Diameter in Circulant Graphs
by: Laila Loudiki, et al.
Published: (2025-05-01) -
Rapid 3D reconstruction of constant-diameter straight pipelines via single-view perspective projection
by: Jiasui Yao, et al.
Published: (2024-12-01) -
FOPID-Controlled Self-Propelled Pipeline Inspection Robot for Internal Mapping of Small-Diameter Pipelines
by: Rizwan Aziz Mangi, et al.
Published: (2025-01-01)