Research on Integration Scheme of Locomotive-Ground Data Transmission Channel

In view of the current redundancy of railway locomotive-ground transmission tunnel construction, a multi-system locomotive-ground data transmission channel integration scheme based on the Chinese locomotive remote monitoring and diagnosis system (CMD system) was proposed, which strengthened and opti...

Full description

Saved in:
Bibliographic Details
Main Authors: Li GONG, Bo JIANG, Weiwei ZHANG, Bo LIU
Format: Article
Language:zho
Published: Editorial Department of Electric Drive for Locomotives 2020-03-01
Series:机车电传动
Subjects:
Online Access:http://edl.csrzic.com/thesisDetails#10.13890/j.issn.1000-128x.2020.02.016
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:In view of the current redundancy of railway locomotive-ground transmission tunnel construction, a multi-system locomotive-ground data transmission channel integration scheme based on the Chinese locomotive remote monitoring and diagnosis system (CMD system) was proposed, which strengthened and optimized the security and efficiency of data transmission. Combining the actual requirements, semi-physical simulation test was carried out to verify the data transmission process. The scheme avoided the problem of repeated investment of on-board equipment and mutual interference of vehicle antenna signals, achieved the purpose of reducing communication tariffs and management difficulty, and provided a technical basis for unified application of locomotive data.
ISSN:1000-128X