Structural integrity assessment and rehabilitating of Hercilio Luz bridge

The Hercílio Luz suspension bridge, built in 1926, has been out of service since 1991 due to high corrosion levels and structural element impairment. A complete rehabilitation project was developed which included the replacement of the impaired items and foundation strengthening. For this, an auxili...

Full description

Saved in:
Bibliographic Details
Main Authors: Hermes Carvalho, Ricardo Hallal Fakury, Paula Moura Leite Vilela
Format: Article
Language:English
Published: Gruppo Italiano Frattura 2017-09-01
Series:Fracture and Structural Integrity
Subjects:
Online Access:https://www.fracturae.com/index.php/fis/article/view/1933
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1846092545289879552
author Hermes Carvalho
Ricardo Hallal Fakury
Paula Moura Leite Vilela
author_facet Hermes Carvalho
Ricardo Hallal Fakury
Paula Moura Leite Vilela
author_sort Hermes Carvalho
collection DOAJ
description The Hercílio Luz suspension bridge, built in 1926, has been out of service since 1991 due to high corrosion levels and structural element impairment. A complete rehabilitation project was developed which included the replacement of the impaired items and foundation strengthening. For this, an auxiliary structure was employed to support the central span during the rehabilitation process. A carefully studied load transfer process, where the central span loading is transferred from the eye-bar towards the auxiliary structure will be performed. For this purpose, a synchronized jacking sequence will be used, which was predefined by means of numerical model analysis. All structural elements had their designs evaluated and some geometric changes were implemented. This paper presents all the methodology developed in the rehabilitation project of Hercilio Luz bridge, as well as the development stages up to the present date.
format Article
id doaj-art-ff2f4df3322d47beae0f522034b11f67
institution Kabale University
issn 1971-8993
language English
publishDate 2017-09-01
publisher Gruppo Italiano Frattura
record_format Article
series Fracture and Structural Integrity
spelling doaj-art-ff2f4df3322d47beae0f522034b11f672025-01-02T20:56:23ZengGruppo Italiano FratturaFracture and Structural Integrity1971-89932017-09-011142Structural integrity assessment and rehabilitating of Hercilio Luz bridgeHermes Carvalho0Ricardo Hallal Fakury1Paula Moura Leite Vilela2Federal University of Minas Gerais, BrasilFederal University of Minas Gerais, BrasilFederal University of Minas Gerais, BrasilThe Hercílio Luz suspension bridge, built in 1926, has been out of service since 1991 due to high corrosion levels and structural element impairment. A complete rehabilitation project was developed which included the replacement of the impaired items and foundation strengthening. For this, an auxiliary structure was employed to support the central span during the rehabilitation process. A carefully studied load transfer process, where the central span loading is transferred from the eye-bar towards the auxiliary structure will be performed. For this purpose, a synchronized jacking sequence will be used, which was predefined by means of numerical model analysis. All structural elements had their designs evaluated and some geometric changes were implemented. This paper presents all the methodology developed in the rehabilitation project of Hercilio Luz bridge, as well as the development stages up to the present date.https://www.fracturae.com/index.php/fis/article/view/1933Structural impairment evaluationBridge rehabilitationLoad transferSynchronized jacking
spellingShingle Hermes Carvalho
Ricardo Hallal Fakury
Paula Moura Leite Vilela
Structural integrity assessment and rehabilitating of Hercilio Luz bridge
Fracture and Structural Integrity
Structural impairment evaluation
Bridge rehabilitation
Load transfer
Synchronized jacking
title Structural integrity assessment and rehabilitating of Hercilio Luz bridge
title_full Structural integrity assessment and rehabilitating of Hercilio Luz bridge
title_fullStr Structural integrity assessment and rehabilitating of Hercilio Luz bridge
title_full_unstemmed Structural integrity assessment and rehabilitating of Hercilio Luz bridge
title_short Structural integrity assessment and rehabilitating of Hercilio Luz bridge
title_sort structural integrity assessment and rehabilitating of hercilio luz bridge
topic Structural impairment evaluation
Bridge rehabilitation
Load transfer
Synchronized jacking
url https://www.fracturae.com/index.php/fis/article/view/1933
work_keys_str_mv AT hermescarvalho structuralintegrityassessmentandrehabilitatingofhercilioluzbridge
AT ricardohallalfakury structuralintegrityassessmentandrehabilitatingofhercilioluzbridge
AT paulamouraleitevilela structuralintegrityassessmentandrehabilitatingofhercilioluzbridge