Primary Current Test Method for Transformer Protection Based on Transient Load

When test load is insufficient, the current transformer (TA) secondary circuit test by primary current cannot be completed, which often results in the failure of new transformer protection to be put into normal operation. In order to solve this problem, a method for testing TA secondary circuit by u...

Full description

Saved in:
Bibliographic Details
Main Author: Jiyin SHI
Format: Article
Language:zho
Published: State Grid Energy Research Institute 2021-05-01
Series:Zhongguo dianli
Subjects:
Online Access:https://www.electricpower.com.cn/CN/10.11930/j.issn.1004-9649.202007025
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1850226418814812160
author Jiyin SHI
author_facet Jiyin SHI
author_sort Jiyin SHI
collection DOAJ
description When test load is insufficient, the current transformer (TA) secondary circuit test by primary current cannot be completed, which often results in the failure of new transformer protection to be put into normal operation. In order to solve this problem, a method for testing TA secondary circuit by using transient current such as motor starting current or transformer magnetizing inrush current is presented. The double-side current relationship of the transformer is analyzed with transient load flowing, and the current is reconstructed according to different wiring groups so that the currents on both sides are proportional. The signal correlation function is introduced to analyze and calculate the current waveform, and the phase angle difference and transformation ratio of TA on both sides of the transformer relative to the reference bay are obtained, thereby determining the correctness of TA secondary circuit. The engineering test results of the proposed method are consistent with that of traditional steady-state load test method, which proves its feasibility and correctness.
format Article
id doaj-art-fea0a7d9addb47f5b6f93d773419d65b
institution OA Journals
issn 1004-9649
language zho
publishDate 2021-05-01
publisher State Grid Energy Research Institute
record_format Article
series Zhongguo dianli
spelling doaj-art-fea0a7d9addb47f5b6f93d773419d65b2025-08-20T02:05:06ZzhoState Grid Energy Research InstituteZhongguo dianli1004-96492021-05-0154514815510.11930/j.issn.1004-9649.202007025zgdl-54-4-shijiyinPrimary Current Test Method for Transformer Protection Based on Transient LoadJiyin SHI0Electric Power Research Institute of State Grid Fujian Electric Power Co., Ltd., Fuzhou 350007, ChinaWhen test load is insufficient, the current transformer (TA) secondary circuit test by primary current cannot be completed, which often results in the failure of new transformer protection to be put into normal operation. In order to solve this problem, a method for testing TA secondary circuit by using transient current such as motor starting current or transformer magnetizing inrush current is presented. The double-side current relationship of the transformer is analyzed with transient load flowing, and the current is reconstructed according to different wiring groups so that the currents on both sides are proportional. The signal correlation function is introduced to analyze and calculate the current waveform, and the phase angle difference and transformation ratio of TA on both sides of the transformer relative to the reference bay are obtained, thereby determining the correctness of TA secondary circuit. The engineering test results of the proposed method are consistent with that of traditional steady-state load test method, which proves its feasibility and correctness.https://www.electricpower.com.cn/CN/10.11930/j.issn.1004-9649.202007025transformer protectiontransient loadprimary current testreconstructing currentcorrelation function
spellingShingle Jiyin SHI
Primary Current Test Method for Transformer Protection Based on Transient Load
Zhongguo dianli
transformer protection
transient load
primary current test
reconstructing current
correlation function
title Primary Current Test Method for Transformer Protection Based on Transient Load
title_full Primary Current Test Method for Transformer Protection Based on Transient Load
title_fullStr Primary Current Test Method for Transformer Protection Based on Transient Load
title_full_unstemmed Primary Current Test Method for Transformer Protection Based on Transient Load
title_short Primary Current Test Method for Transformer Protection Based on Transient Load
title_sort primary current test method for transformer protection based on transient load
topic transformer protection
transient load
primary current test
reconstructing current
correlation function
url https://www.electricpower.com.cn/CN/10.11930/j.issn.1004-9649.202007025
work_keys_str_mv AT jiyinshi primarycurrenttestmethodfortransformerprotectionbasedontransientload