Measurement and Simulation Analysis of Vertical Cross Longitudinal Settlement between Turning Shield and Foundation Pit

Using numerical simulation technology, the dynamic three-dimensional model of the turning shield and the foundation pit under the condition of vertical intersection is established. The disturbance law of the longitudinal settlement of the foundation pit under the condition of shield construction is...

Full description

Saved in:
Bibliographic Details
Main Authors: Hua Yin, Hong Zhang, Rui Zhang
Format: Article
Language:English
Published: Wiley 2021-01-01
Series:Advances in Civil Engineering
Online Access:http://dx.doi.org/10.1155/2021/6698268
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1849469539131064320
author Hua Yin
Hong Zhang
Rui Zhang
author_facet Hua Yin
Hong Zhang
Rui Zhang
author_sort Hua Yin
collection DOAJ
description Using numerical simulation technology, the dynamic three-dimensional model of the turning shield and the foundation pit under the condition of vertical intersection is established. The disturbance law of the longitudinal settlement of the foundation pit under the condition of shield construction is studied, and the stress path in the soil is analyzed. The results show that with the gradual advance of the turning shield construction, the settlement mode of the foundation pit changes with the shield construction. During the construction of the turning shield, when the tunnel face is located in front of the foundation pit and under the foundation pit, the ground loss rate is inconsistent, which leads to the change of settlement mode. Under the influence of turning shield construction disturbance, the soil undergoes compression deformation caused by larger additional stress increase; after shield crossing, the soil undergoes unloading deformation caused by more obvious stress relaxation.
format Article
id doaj-art-fd847cc67caf4aa6824204c649f80ab2
institution Kabale University
issn 1687-8086
1687-8094
language English
publishDate 2021-01-01
publisher Wiley
record_format Article
series Advances in Civil Engineering
spelling doaj-art-fd847cc67caf4aa6824204c649f80ab22025-08-20T03:25:26ZengWileyAdvances in Civil Engineering1687-80861687-80942021-01-01202110.1155/2021/66982686698268Measurement and Simulation Analysis of Vertical Cross Longitudinal Settlement between Turning Shield and Foundation PitHua Yin0Hong Zhang1Rui Zhang2Transportation Institute, Inner Mongolia University, Hohhot 010070, ChinaTransportation Institute, Inner Mongolia University, Hohhot 010070, ChinaTransportation Institute, Inner Mongolia University, Hohhot 010070, ChinaUsing numerical simulation technology, the dynamic three-dimensional model of the turning shield and the foundation pit under the condition of vertical intersection is established. The disturbance law of the longitudinal settlement of the foundation pit under the condition of shield construction is studied, and the stress path in the soil is analyzed. The results show that with the gradual advance of the turning shield construction, the settlement mode of the foundation pit changes with the shield construction. During the construction of the turning shield, when the tunnel face is located in front of the foundation pit and under the foundation pit, the ground loss rate is inconsistent, which leads to the change of settlement mode. Under the influence of turning shield construction disturbance, the soil undergoes compression deformation caused by larger additional stress increase; after shield crossing, the soil undergoes unloading deformation caused by more obvious stress relaxation.http://dx.doi.org/10.1155/2021/6698268
spellingShingle Hua Yin
Hong Zhang
Rui Zhang
Measurement and Simulation Analysis of Vertical Cross Longitudinal Settlement between Turning Shield and Foundation Pit
Advances in Civil Engineering
title Measurement and Simulation Analysis of Vertical Cross Longitudinal Settlement between Turning Shield and Foundation Pit
title_full Measurement and Simulation Analysis of Vertical Cross Longitudinal Settlement between Turning Shield and Foundation Pit
title_fullStr Measurement and Simulation Analysis of Vertical Cross Longitudinal Settlement between Turning Shield and Foundation Pit
title_full_unstemmed Measurement and Simulation Analysis of Vertical Cross Longitudinal Settlement between Turning Shield and Foundation Pit
title_short Measurement and Simulation Analysis of Vertical Cross Longitudinal Settlement between Turning Shield and Foundation Pit
title_sort measurement and simulation analysis of vertical cross longitudinal settlement between turning shield and foundation pit
url http://dx.doi.org/10.1155/2021/6698268
work_keys_str_mv AT huayin measurementandsimulationanalysisofverticalcrosslongitudinalsettlementbetweenturningshieldandfoundationpit
AT hongzhang measurementandsimulationanalysisofverticalcrosslongitudinalsettlementbetweenturningshieldandfoundationpit
AT ruizhang measurementandsimulationanalysisofverticalcrosslongitudinalsettlementbetweenturningshieldandfoundationpit