Management of contractor's claim in Turnkey projects according to FIDIC under termination and dissolution of contract
Generally, increasing complexity of the structural stages of the contracts and contracting conditions as well as inconvenient conditions of projects including Meteorological, political, and leads to intensification of disputes, claims and litigation between the parties to the contract and the result...
Saved in:
| Main Authors: | Amir Momeni, Mohsen Heidari |
|---|---|
| Format: | Article |
| Language: | fas |
| Published: |
Assist. Prof. Dr. Roohollah Taherkhani
2019-02-01
|
| Series: | مهندسی و مدیریت ساخت |
| Subjects: | |
| Online Access: | https://www.jecm.ir/article_87284_a6c9518a4bbb1c90d15610aecb67828f.pdf |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Identification of contractors claims in Turnkey projects according to FIDIC by the system dynamics method
(Case study on the 7008 housing units building project in Ojeda, Venezuela)
by: Amir Momeni, et al.
Published: (2019-02-01) -
A comparative study of the nature and scope of implementation of turnkey obligations in Iranian law and the model contract of the International Federation of Consulting Engineers (FIDIC)
by: Mohammad Norouzi, et al.
Published: (2024-12-01) -
Statistical Evaluation for claims and disputes in construction contracts
by: Raid Saleem Abd Ali, et al.
Published: (2017-05-01) -
Contemporary Methods of Resolving Disputes Arising from FIDI C Construction Contracts Between the Employer and Contractor
by: Odai Mohammad AlHeilat, et al.
Published: (2024-09-01) -
Outsourcing in Sandy Springs and Other US Cities: Insights for Other Countries
by: Ari-Veikko Anttiroiko, et al.
Published: (2013-11-01)