Improving the Operation of a Distribution Network by Optimal Siting and Sizing of Photovoltaic-Battery Energy Storage Systems

This paper proposes an updated two-step approach to improve the operation of a distribution network (DN) through the optimal siting and sizing of one, two, or three systems, each consisting of a photovoltaic (PV) generator and a battery energy storage (BES) unit – the so-called “PV-BES system”. The...

Full description

Saved in:
Bibliographic Details
Main Authors: Nikola N. Krstic, Dragan S. Tasic, Dardan O. Klimenta, Milos J. Milovanovic
Format: Article
Language:English
Published: Kaunas University of Technology 2024-10-01
Series:Elektronika ir Elektrotechnika
Subjects:
Online Access:https://eejournal.ktu.lt/index.php/elt/article/view/38870
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1846142315331059712
author Nikola N. Krstic
Dragan S. Tasic
Dardan O. Klimenta
Milos J. Milovanovic
author_facet Nikola N. Krstic
Dragan S. Tasic
Dardan O. Klimenta
Milos J. Milovanovic
author_sort Nikola N. Krstic
collection DOAJ
description This paper proposes an updated two-step approach to improve the operation of a distribution network (DN) through the optimal siting and sizing of one, two, or three systems, each consisting of a photovoltaic (PV) generator and a battery energy storage (BES) unit – the so-called “PV-BES system”. The first step of the approach determines the optimal sites and optimal powers of the PV-BES systems, taking into account the DN load profile and the required improvement in DN operation. Parameters used to describe the quality of the DN operation include the average daily power losses and the voltage profile quality index of the DN. The optimal locations and optimal powers of the PV-BES systems are determined using metaheuristics of the particle swarm optimisation (PSO) and wild horse optimisation (WHO) methods considering various daily load profiles. Based on the optimal powers of the first step and the known daily variation of solar irradiation, the second step provides the individual maximum powers of the PV generators and BES units, as well as the storage capacities of the BES units required for the sizing of the PV-BES systems. The iterative method used for the sizing of the PV-BES systems in the second step of the proposed approach can be regarded as a novelty. Finally, all results were obtained using the IEEE 33-bus test radial DN topology, considering different numbers of PV-BES systems connected to the DN, different efficiencies of the BES units, and different priorities in the criterion function.
format Article
id doaj-art-fd0c442ccaba45ad866a32c8badc7920
institution Kabale University
issn 1392-1215
2029-5731
language English
publishDate 2024-10-01
publisher Kaunas University of Technology
record_format Article
series Elektronika ir Elektrotechnika
spelling doaj-art-fd0c442ccaba45ad866a32c8badc79202024-12-03T13:46:24ZengKaunas University of TechnologyElektronika ir Elektrotechnika1392-12152029-57312024-10-01305708210.5755/j02.eie.3887044124Improving the Operation of a Distribution Network by Optimal Siting and Sizing of Photovoltaic-Battery Energy Storage SystemsNikola N. Krstic0Dragan S. Tasic1Dardan O. Klimenta2Milos J. Milovanovic3Department of Power Engineering, Faculty of Electronic Engineering, University of Nis, Nis, SerbiaDepartment of Power Engineering, Faculty of Electronic Engineering, University of Nis, Nis, SerbiaDepartment of Power Engineering, Faculty of Technical Sciences, University of Pristina in Kosovska Mitrovica, Kosovska Mitrovica, SerbiaDepartment of Power Engineering, Faculty of Technical Sciences, University of Pristina in Kosovska Mitrovica, Kosovska Mitrovica, SerbiaThis paper proposes an updated two-step approach to improve the operation of a distribution network (DN) through the optimal siting and sizing of one, two, or three systems, each consisting of a photovoltaic (PV) generator and a battery energy storage (BES) unit – the so-called “PV-BES system”. The first step of the approach determines the optimal sites and optimal powers of the PV-BES systems, taking into account the DN load profile and the required improvement in DN operation. Parameters used to describe the quality of the DN operation include the average daily power losses and the voltage profile quality index of the DN. The optimal locations and optimal powers of the PV-BES systems are determined using metaheuristics of the particle swarm optimisation (PSO) and wild horse optimisation (WHO) methods considering various daily load profiles. Based on the optimal powers of the first step and the known daily variation of solar irradiation, the second step provides the individual maximum powers of the PV generators and BES units, as well as the storage capacities of the BES units required for the sizing of the PV-BES systems. The iterative method used for the sizing of the PV-BES systems in the second step of the proposed approach can be regarded as a novelty. Finally, all results were obtained using the IEEE 33-bus test radial DN topology, considering different numbers of PV-BES systems connected to the DN, different efficiencies of the BES units, and different priorities in the criterion function.https://eejournal.ktu.lt/index.php/elt/article/view/38870battery energy storage (bes) unitdistribution network (dn)wild horse optimisation (who)particle swarm optimisation (pso)photovoltaic (pv) generator
spellingShingle Nikola N. Krstic
Dragan S. Tasic
Dardan O. Klimenta
Milos J. Milovanovic
Improving the Operation of a Distribution Network by Optimal Siting and Sizing of Photovoltaic-Battery Energy Storage Systems
Elektronika ir Elektrotechnika
battery energy storage (bes) unit
distribution network (dn)
wild horse optimisation (who)
particle swarm optimisation (pso)
photovoltaic (pv) generator
title Improving the Operation of a Distribution Network by Optimal Siting and Sizing of Photovoltaic-Battery Energy Storage Systems
title_full Improving the Operation of a Distribution Network by Optimal Siting and Sizing of Photovoltaic-Battery Energy Storage Systems
title_fullStr Improving the Operation of a Distribution Network by Optimal Siting and Sizing of Photovoltaic-Battery Energy Storage Systems
title_full_unstemmed Improving the Operation of a Distribution Network by Optimal Siting and Sizing of Photovoltaic-Battery Energy Storage Systems
title_short Improving the Operation of a Distribution Network by Optimal Siting and Sizing of Photovoltaic-Battery Energy Storage Systems
title_sort improving the operation of a distribution network by optimal siting and sizing of photovoltaic battery energy storage systems
topic battery energy storage (bes) unit
distribution network (dn)
wild horse optimisation (who)
particle swarm optimisation (pso)
photovoltaic (pv) generator
url https://eejournal.ktu.lt/index.php/elt/article/view/38870
work_keys_str_mv AT nikolankrstic improvingtheoperationofadistributionnetworkbyoptimalsitingandsizingofphotovoltaicbatteryenergystoragesystems
AT draganstasic improvingtheoperationofadistributionnetworkbyoptimalsitingandsizingofphotovoltaicbatteryenergystoragesystems
AT dardanoklimenta improvingtheoperationofadistributionnetworkbyoptimalsitingandsizingofphotovoltaicbatteryenergystoragesystems
AT milosjmilovanovic improvingtheoperationofadistributionnetworkbyoptimalsitingandsizingofphotovoltaicbatteryenergystoragesystems