Switch test method of train communication network based on Ethernet

As the node of train network data gathering, storage and transmit which based on Ethernet, switches have been the core equipment of train network communication and control. By analyzing the application requirements of train control and diagnosis based on train communication network topology and Ethe...

Full description

Saved in:
Bibliographic Details
Main Author: YANG Peng
Format: Article
Language:zho
Published: Editorial Department of Electric Drive for Locomotives 2022-01-01
Series:机车电传动
Subjects:
Online Access:http://edl.csrzic.com/thesisDetails#10.13890/j.issn.1000-128X.2022.01.020
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1849323614403297280
author YANG Peng
author_facet YANG Peng
author_sort YANG Peng
collection DOAJ
description As the node of train network data gathering, storage and transmit which based on Ethernet, switches have been the core equipment of train network communication and control. By analyzing the application requirements of train control and diagnosis based on train communication network topology and Ethernet, and concluding the services to be provided by ETB and ECN switches, a function and performance test method for ETB switch and ECN switch was raised, which could cover the physical layer, data link layer, the network layer, the transport layer and the application layer. The physical layer was based on the general test method of electronic products of the rolling stock. The data link layer and network layer adopted throughput, latency, back-to-back tests, and tests based on the requirement of QoS and ARP. The transport layer and the application layer adopted end-to-end data communication test, IGMP test and SNMP test, with the detailed test configuration and steps. The test method could meet the requirements of real-time, security and reliability of switches in TCN based on Ethernet. At last, taking an ECN managed consist switch as an example, the test evaluation scheme was introduced. The scheme fully met the performance testing requirements of the layer 2 or layer 3 switches interface test. It also met the test requirements of process data, message data, best effort data transmission in the train network, and the test requirements of related protocols. By standardizing the test method, a new solution for Ethernet switch performance consistency control was provided.
format Article
id doaj-art-f887d2e9dd74437f8ae6d8bbdde6bedb
institution Kabale University
issn 1000-128X
language zho
publishDate 2022-01-01
publisher Editorial Department of Electric Drive for Locomotives
record_format Article
series 机车电传动
spelling doaj-art-f887d2e9dd74437f8ae6d8bbdde6bedb2025-08-20T03:48:58ZzhoEditorial Department of Electric Drive for Locomotives机车电传动1000-128X2022-01-0112012623979149Switch test method of train communication network based on EthernetYANG PengAs the node of train network data gathering, storage and transmit which based on Ethernet, switches have been the core equipment of train network communication and control. By analyzing the application requirements of train control and diagnosis based on train communication network topology and Ethernet, and concluding the services to be provided by ETB and ECN switches, a function and performance test method for ETB switch and ECN switch was raised, which could cover the physical layer, data link layer, the network layer, the transport layer and the application layer. The physical layer was based on the general test method of electronic products of the rolling stock. The data link layer and network layer adopted throughput, latency, back-to-back tests, and tests based on the requirement of QoS and ARP. The transport layer and the application layer adopted end-to-end data communication test, IGMP test and SNMP test, with the detailed test configuration and steps. The test method could meet the requirements of real-time, security and reliability of switches in TCN based on Ethernet. At last, taking an ECN managed consist switch as an example, the test evaluation scheme was introduced. The scheme fully met the performance testing requirements of the layer 2 or layer 3 switches interface test. It also met the test requirements of process data, message data, best effort data transmission in the train network, and the test requirements of related protocols. By standardizing the test method, a new solution for Ethernet switch performance consistency control was provided.http://edl.csrzic.com/thesisDetails#10.13890/j.issn.1000-128X.2022.01.020train communication networkswitchethernet train backboneethernet consist networkthroughputtransport layer test
spellingShingle YANG Peng
Switch test method of train communication network based on Ethernet
机车电传动
train communication network
switch
ethernet train backbone
ethernet consist network
throughput
transport layer test
title Switch test method of train communication network based on Ethernet
title_full Switch test method of train communication network based on Ethernet
title_fullStr Switch test method of train communication network based on Ethernet
title_full_unstemmed Switch test method of train communication network based on Ethernet
title_short Switch test method of train communication network based on Ethernet
title_sort switch test method of train communication network based on ethernet
topic train communication network
switch
ethernet train backbone
ethernet consist network
throughput
transport layer test
url http://edl.csrzic.com/thesisDetails#10.13890/j.issn.1000-128X.2022.01.020
work_keys_str_mv AT yangpeng switchtestmethodoftraincommunicationnetworkbasedonethernet