Life Cycle Cost Analysis And Payback Period of 12-Kw Wind Turbine For a Remote Telecommunications Base Station In Malaysia
Owing to the unavailability of electricity in many remote areas in Peninsular and East Malaysia, these areas do not have access to telephone signals. In remote areas, a diesel generator is used as the power source for the telecommunications base station. Hence, the continuous supply of diesel (which...
Saved in:
| Main Authors: | A. Azmi, Abdi Hanra Sebayang*, Aditiya Harjon |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Syiah Kuala University
2023-09-01
|
| Series: | Aceh International Journal of Science and Technology |
| Subjects: | |
| Online Access: | https://jurnal.usk.ac.id/AIJST/article/view/33010 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Who benefits from fleet electrification? quantifying the costs and benefits of transportation electrification strategies from different perspectives
by: J.Andrew Kelly, et al.
Published: (2025-07-01) -
How Economic Theories Shape Chemical Technology Profile
by: Despina A. Gkika, et al.
Published: (2024-09-01) -
A Practical Framework and Model for Promoting Cost-Inclusive Evaluations
by: Nadini Persaud
Published: (2018-04-01) -
An Introduction to Economic Analysis of Pest Management: A Case Study of Nematode Management
by: Yi Li, et al.
Published: (2025-02-01) -
COST BENEFIT ANALYSIS OF COMPROMISING LEDGER SYSTEM BASED ON BLOCKCHAIN TECHNOLOGY
by: Edis Mekić, et al.
Published: (2018-12-01)