Integrated Scheduling Optimization for Multi-Line Production and Transportation of Prefabricated Components Considering Shared Resources
With the increasing popularity of prefabricated buildings, more and more precast plants have been equipped with multiple production lines to increase productivity and meet the growing market demand. Sharing equipment, human, and transportation resources is a typical feature of integrated scheduling...
Saved in:
Main Authors: | Yiran Dan, Chengshuang Sun, Qianmai Luo |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2025-01-01
|
Series: | Buildings |
Subjects: | |
Online Access: | https://www.mdpi.com/2075-5309/15/2/187 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
MONITORING OF THE NOISE LEVEL GENERATED WHEN THE MILLING OF REINFORCED CONCRETE PREFABRICATES AT MACOFIL S.A. TÂRGU JIU
by: Emil Catalin SCHIOPU, et al.
Published: (2022-05-01) -
Knowledge Integration and Analysis of Technological Innovation in Prefabricated Construction
by: Yudan Dou, et al.
Published: (2025-01-01) -
Kinetics of extracting magnesium from prefabricated pellets by silicothermic process under flowing argon atmosphere
by: Guo J.-H., et al.
Published: (2020-01-01) -
Causal Analysis and Prevention Strategies for Safety Risks in Prefabricated Building Construction Based on Accident Data and Complex Network Theory
by: Wei Liu, et al.
Published: (2025-01-01) -
Experimental and Finite Element Analysis on the Structural Performance of Lightweight Hollow Slab Prefabricated Staircases
by: Jingmin Liu, et al.
Published: (2025-01-01)