Structural Design of City Railway Underground Depot with Reserved Conditions for Overlying Property Development

[Objective] To further improve land use efficiency, reduce the fragmentation of urban space, enhance the regional urban image, and avoid the impact of regional transportation three-dimensional development and pedestrian system, it is necessary to conduct research on the key technologies for city rai...

Full description

Saved in:
Bibliographic Details
Main Author: TAN Qifeng
Format: Article
Language:zho
Published: Urban Mass Transit Magazine Press 2025-01-01
Series:Chengshi guidao jiaotong yanjiu
Subjects:
Online Access:https://umt1998.tongji.edu.cn/journal/paper/doi/10.16037/j.1007-869x.2025.01.013.html
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1841543653139415040
author TAN Qifeng
author_facet TAN Qifeng
author_sort TAN Qifeng
collection DOAJ
description [Objective] To further improve land use efficiency, reduce the fragmentation of urban space, enhance the regional urban image, and avoid the impact of regional transportation three-dimensional development and pedestrian system, it is necessary to conduct research on the key technologies for city railway underground depot structural design with reserved conditions for the overlying property development. [Method] In a case study of Shenkun Road Parking Lot Project of Shanghai City Railway Airport Link Line, based on the differences in structural design between the underground vehicle depot with reserved conditions for the overlying property development and the ground vehicle depot, the structural design challenges of the above-mentioned underground vehicle depot are studied, and the key technologies, such as the temperature cracks of super-long structures, structural waterproofing, and discontinuous construction structures in the construction process of the underground vehicle depot, are specifically analyzed. [Result & Conclusion] The anti-cracking reinforcing bars are configured according to the temperature stress results of the super-long cover plate without joints, theoretically restricting the concrete cracks and avoiding cracking and water leakage of the self-waterproof concrete. Alternative waterproofing solutions for the side walls and bottom plates from the structural aspect are proposed by the designer, against the possible water leakage caused by the construction quality, maintenance, closure conditions and the design differences. The optimal solution combining temporary anti-floating measures and the reservation of the construction load in the cover plate is proposed for the asynchronous construction of the underground vehicle depot structure and the overlying property development structure.
format Article
id doaj-art-ef7869fdc039432f88c28fa19c8ee3d6
institution Kabale University
issn 1007-869X
language zho
publishDate 2025-01-01
publisher Urban Mass Transit Magazine Press
record_format Article
series Chengshi guidao jiaotong yanjiu
spelling doaj-art-ef7869fdc039432f88c28fa19c8ee3d62025-01-13T08:04:42ZzhoUrban Mass Transit Magazine PressChengshi guidao jiaotong yanjiu1007-869X2025-01-01281737810.16037/j.1007-869x.2025.01.013Structural Design of City Railway Underground Depot with Reserved Conditions for Overlying Property DevelopmentTAN Qifeng0China Railway Shanghai Design Institute Group Co, Ltd, 200070, Shanghai, China[Objective] To further improve land use efficiency, reduce the fragmentation of urban space, enhance the regional urban image, and avoid the impact of regional transportation three-dimensional development and pedestrian system, it is necessary to conduct research on the key technologies for city railway underground depot structural design with reserved conditions for the overlying property development. [Method] In a case study of Shenkun Road Parking Lot Project of Shanghai City Railway Airport Link Line, based on the differences in structural design between the underground vehicle depot with reserved conditions for the overlying property development and the ground vehicle depot, the structural design challenges of the above-mentioned underground vehicle depot are studied, and the key technologies, such as the temperature cracks of super-long structures, structural waterproofing, and discontinuous construction structures in the construction process of the underground vehicle depot, are specifically analyzed. [Result & Conclusion] The anti-cracking reinforcing bars are configured according to the temperature stress results of the super-long cover plate without joints, theoretically restricting the concrete cracks and avoiding cracking and water leakage of the self-waterproof concrete. Alternative waterproofing solutions for the side walls and bottom plates from the structural aspect are proposed by the designer, against the possible water leakage caused by the construction quality, maintenance, closure conditions and the design differences. The optimal solution combining temporary anti-floating measures and the reservation of the construction load in the cover plate is proposed for the asynchronous construction of the underground vehicle depot structure and the overlying property development structure.https://umt1998.tongji.edu.cn/journal/paper/doi/10.16037/j.1007-869x.2025.01.013.htmlcity railwayunderground vehicle depot structurereserved conditions for overlying property development
spellingShingle TAN Qifeng
Structural Design of City Railway Underground Depot with Reserved Conditions for Overlying Property Development
Chengshi guidao jiaotong yanjiu
city railway
underground vehicle depot structure
reserved conditions for overlying property development
title Structural Design of City Railway Underground Depot with Reserved Conditions for Overlying Property Development
title_full Structural Design of City Railway Underground Depot with Reserved Conditions for Overlying Property Development
title_fullStr Structural Design of City Railway Underground Depot with Reserved Conditions for Overlying Property Development
title_full_unstemmed Structural Design of City Railway Underground Depot with Reserved Conditions for Overlying Property Development
title_short Structural Design of City Railway Underground Depot with Reserved Conditions for Overlying Property Development
title_sort structural design of city railway underground depot with reserved conditions for overlying property development
topic city railway
underground vehicle depot structure
reserved conditions for overlying property development
url https://umt1998.tongji.edu.cn/journal/paper/doi/10.16037/j.1007-869x.2025.01.013.html
work_keys_str_mv AT tanqifeng structuraldesignofcityrailwayundergrounddepotwithreservedconditionsforoverlyingpropertydevelopment