Compaction Quality Inspection Method of Soil-Rock Filled Embankment Based on Continuous Compaction Control Technology

Affected by the site construction conditions, the measurement passes of the Taihang Expressway K8 + 105 ∼ K8 + 341 (K8 worksite) in the Taihang Expressway did not meet the requirements of data analysis, and the quantity of the control points was insufficient so that the linear correlation between th...

Full description

Saved in:
Bibliographic Details
Main Authors: Zhuoling He, Junyun Zhang
Format: Article
Language:English
Published: Wiley 2021-01-01
Series:Advances in Civil Engineering
Online Access:http://dx.doi.org/10.1155/2021/8894042
Tags: Add Tag
No Tags, Be the first to tag this record!

Similar Items