Compaction Quality Inspection Method of Soil-Rock Filled Embankment Based on Continuous Compaction Control Technology
Affected by the site construction conditions, the measurement passes of the Taihang Expressway K8 + 105 ∼ K8 + 341 (K8 worksite) in the Taihang Expressway did not meet the requirements of data analysis, and the quantity of the control points was insufficient so that the linear correlation between th...
Saved in:
Main Authors: | Zhuoling He, Junyun Zhang |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2021-01-01
|
Series: | Advances in Civil Engineering |
Online Access: | http://dx.doi.org/10.1155/2021/8894042 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Expansive Soil Embankment Filling and Cutting Treatment Technology: A Systematic Review
by: Zhen Huang, et al.
Published: (2022-01-01) -
Topsoil Compaction Risk Based on the Different Responses of Soil Structure to Compaction Stress
by: Huiqing Zhang, et al.
Published: (2024-12-01) -
Soil Compaction in the Urban Landscape
by: Amy L. Shober, et al.
Published: (2010-04-01) -
Soil Compaction in the Urban Landscape
by: Amy L. Shober, et al.
Published: (2010-04-01) -
Analysis of the Stability of Reinforced Plastic Waste Treated Clay as Embankment Fill on Soft Soils
by: Shelema Amena
Published: (2022-01-01)