Construction Sequence Optimization and Settlement Control Countermeasures of Metro Tunnels Underpassing Expressway
The Chongqing metro line 6 underpass expressway around the city is taken as an engineering background, and the optimal excavation sequence and corresponding control countermeasures for the triangular-distributed three-line metro tunnel underpass expressway are studied. The influences of excavation s...
Saved in:
| Main Authors: | Chengzhong Zhang, Qiang Zhang, Ziming Pei, Zhanping Song, Junbao Wang |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Wiley
2021-01-01
|
| Series: | Advances in Civil Engineering |
| Online Access: | http://dx.doi.org/10.1155/2021/8834368 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Calculation Method for Settlement Deformation of Existing Tunnel Induced by Underpass Construction
by: Lan Cao, et al.
Published: (2025-02-01) -
Settlement Behaviors of Metro Tunnels during the Metro Operation
by: Wenbo Shi, et al.
Published: (2015-01-01) -
Field Observation and Theoretical Study on an Existing Tunnel Underpassed by New Twin Tunnels
by: Qiongfang Zhang
Published: (2018-01-01) -
Machine learning-based forecasting of ground surface settlement induced by metro shield tunneling construction
by: Qiankun Wang, et al.
Published: (2024-12-01) -
Study on Optimization of Night Illumination in Expressway Long Tunnels
by: Weihua Zhao, et al.
Published: (2012-01-01)