Safety Supervision of Civil Engineering Work in Dam of Guangzhao Hydropower Station in Guizhou
Saved in:
| Main Author: | CHEN Cuang-ping |
|---|---|
| Format: | Article |
| Language: | zho |
| Published: |
Editorial Office of Pearl River
2009-01-01
|
| Series: | Renmin Zhujiang |
| Online Access: | http://www.renminzhujiang.cn/thesisDetails?columnId=47661325&Fpath=home&index=0 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Quality Control of Roller Compacted Concrete Engineering in Dam of Guangzhao Hydroelectricity Station in Beipanjiang River of Guizhou
by: CHEN Guang-ping
Published: (2009-01-01) -
Correlation analysis and comprehensive evaluation of dam safety monitoring at Silin hydropower station
by: Weixing Yang, et al.
Published: (2025-08-01) -
Design of Concrete-face Rock-fill Dam in Deze Hydropower Station
by: YANG Jian-xue, et al.
Published: (2009-01-01) -
Construction Technology of Roller Compaction for the Dam of Shankou Ⅲ Hydropower Station
by: 蓝腾辉, et al.
Published: (2004-01-01) -
Treatment of Cracks in Dam Toe with Chemical Grouting for Gudongkou Hydropower Station
by: 杨学红, et al.
Published: (2002-01-01)