Analysis of fuzzy TOPSIS Method in Determining Priority of Small Dams Construction
The limited government budget for the construction of small dam in Semarang Regency has led to the need to determine the construction priorities. However, the large number of construction's technical aspects causes the determination of the construction priorities to be difficult. One of the bes...
Saved in:
| Main Authors: | Desyta Ulfiana, Suharyanto Suharyanto |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Universitas Negeri Semarang
2019-10-01
|
| Series: | Jurnal Teknik Sipil dan Perencanaan |
| Subjects: | |
| Online Access: | https://journal.unnes.ac.id/nju/jtsp/article/view/19957 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Scoring open-ended items using the fuzzy topsis method and comparing it with traditional approaches
by: Aykut Çitci, et al.
Published: (2024-06-01) -
RESEARCH IN THE FIELD OF SMALL CONSTRUCTION OF DAMS AND PROSPECTS FOR THE USE OF DRAIN OF SMALL MOUNTAIN RIVERS OF DAGESTAN
by: A. S. Ragimova
Published: (2016-07-01) -
Fuzzy logic and exploratory regression-based dam site identification
by: Imran Ahmad, et al.
Published: (2025-04-01) -
A Fuzzy Multi-Criteria Approach for Selecting Open-Source ERP Systems in SMEs Using Fuzzy AHP and TOPSIS
by: Dana Marsetiya Utama, et al.
Published: (2025-01-01) -
APPLICATION OF THE FUZZY TOPSIS METHOD FOR LECTURER CERTIFICATION ASSESSMENT
by: Stephanie Marceline Raintung, et al.
Published: (2025-07-01)