Analysis of fuzzy TOPSIS Method in Determining Priority of Small Dams Construction

The limited government budget for the construction of small dam in Semarang Regency has led to the need to determine the construction priorities. However, the large number of construction's technical aspects causes the determination of the construction priorities to be difficult. One of the bes...

Full description

Saved in:
Bibliographic Details
Main Authors: Desyta Ulfiana, Suharyanto Suharyanto
Format: Article
Language:English
Published: Universitas Negeri Semarang 2019-10-01
Series:Jurnal Teknik Sipil dan Perencanaan
Subjects:
Online Access:https://journal.unnes.ac.id/nju/jtsp/article/view/19957
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1850164216441339904
author Desyta Ulfiana
Suharyanto Suharyanto
author_facet Desyta Ulfiana
Suharyanto Suharyanto
author_sort Desyta Ulfiana
collection DOAJ
description The limited government budget for the construction of small dam in Semarang Regency has led to the need to determine the construction priorities. However, the large number of construction's technical aspects causes the determination of the construction priorities to be difficult. One of the best methods for multi-criteria decision making is the Technique for Order Performance by Similarity to Ideal Solution (TOPSIS). However, ranking and weighting of the criteria that use in these constructions were difficult. It was caused by human assessment factors that were less precise especially on linguistic variables criteria. Therefore, a fuzzy logic was needed for calculating these criteria. There are eight alternatives of small dams and seven criteria of technical aspects analyzed in this study. The first step was determining membership function and weighting each criteria. Then, TOPSIS method was applied to ranked eight alternatives. The highest priority was determined by finding alternative that has the largest closeness coefficient (CCi). It represents alternative with closest distance to fuzzy positive ideal solution and farthest distance to fuzzy negative ideal solution. Based on analysis, Mluweh Dams has the highest CCi value of 0.612. It could be concluded that Mluweh Dams is the highest construction priority of small dams in Semarang Regency.
format Article
id doaj-art-eabb0d03a1a249688a7cff40293c1cf2
institution OA Journals
issn 1411-1772
2503-1899
language English
publishDate 2019-10-01
publisher Universitas Negeri Semarang
record_format Article
series Jurnal Teknik Sipil dan Perencanaan
spelling doaj-art-eabb0d03a1a249688a7cff40293c1cf22025-08-20T02:22:02ZengUniversitas Negeri SemarangJurnal Teknik Sipil dan Perencanaan1411-17722503-18992019-10-01212465310.15294/jtsp.v21i2.199579021Analysis of fuzzy TOPSIS Method in Determining Priority of Small Dams ConstructionDesyta Ulfiana0Suharyanto Suharyanto1Civil Engineering Department, Engineering Faculty, Diponegoro University, Semarang, IndonesiaCivil Engineering Department, Engineering Faculty, Diponegoro University, Semarang, IndonesiaThe limited government budget for the construction of small dam in Semarang Regency has led to the need to determine the construction priorities. However, the large number of construction's technical aspects causes the determination of the construction priorities to be difficult. One of the best methods for multi-criteria decision making is the Technique for Order Performance by Similarity to Ideal Solution (TOPSIS). However, ranking and weighting of the criteria that use in these constructions were difficult. It was caused by human assessment factors that were less precise especially on linguistic variables criteria. Therefore, a fuzzy logic was needed for calculating these criteria. There are eight alternatives of small dams and seven criteria of technical aspects analyzed in this study. The first step was determining membership function and weighting each criteria. Then, TOPSIS method was applied to ranked eight alternatives. The highest priority was determined by finding alternative that has the largest closeness coefficient (CCi). It represents alternative with closest distance to fuzzy positive ideal solution and farthest distance to fuzzy negative ideal solution. Based on analysis, Mluweh Dams has the highest CCi value of 0.612. It could be concluded that Mluweh Dams is the highest construction priority of small dams in Semarang Regency.https://journal.unnes.ac.id/nju/jtsp/article/view/19957fuzzy logic, topsis, construction priority, small dams
spellingShingle Desyta Ulfiana
Suharyanto Suharyanto
Analysis of fuzzy TOPSIS Method in Determining Priority of Small Dams Construction
Jurnal Teknik Sipil dan Perencanaan
fuzzy logic, topsis, construction priority, small dams
title Analysis of fuzzy TOPSIS Method in Determining Priority of Small Dams Construction
title_full Analysis of fuzzy TOPSIS Method in Determining Priority of Small Dams Construction
title_fullStr Analysis of fuzzy TOPSIS Method in Determining Priority of Small Dams Construction
title_full_unstemmed Analysis of fuzzy TOPSIS Method in Determining Priority of Small Dams Construction
title_short Analysis of fuzzy TOPSIS Method in Determining Priority of Small Dams Construction
title_sort analysis of fuzzy topsis method in determining priority of small dams construction
topic fuzzy logic, topsis, construction priority, small dams
url https://journal.unnes.ac.id/nju/jtsp/article/view/19957
work_keys_str_mv AT desytaulfiana analysisoffuzzytopsismethodindeterminingpriorityofsmalldamsconstruction
AT suharyantosuharyanto analysisoffuzzytopsismethodindeterminingpriorityofsmalldamsconstruction