Solar Energy Potential In Regulating Pond Hydroelectric Power Plant Renun Using Helioscope

The availability of fossil fuels is increasingly depleting and environmental problems resulting from burning fossil fuels have an impact on environmental problems in the global region, so that efforts are needed to promote alternative energy sources called renewable energy. The Renun Hydroelectric P...

Full description

Saved in:
Bibliographic Details
Main Authors: Gatot Mochamad Muchtar, Purnama Helena Hutabarat
Format: Article
Language:English
Published: Universitas Negeri Padang 2024-02-01
Series:Jurnal Teknik Elektro Indonesia
Online Access:http://jtein.ppj.unp.ac.id/index.php/JTEIN/article/view/611
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1849311288218353664
author Gatot Mochamad Muchtar
Purnama Helena Hutabarat
author_facet Gatot Mochamad Muchtar
Purnama Helena Hutabarat
author_sort Gatot Mochamad Muchtar
collection DOAJ
description The availability of fossil fuels is increasingly depleting and environmental problems resulting from burning fossil fuels have an impact on environmental problems in the global region, so that efforts are needed to promote alternative energy sources called renewable energy. The Renun Hydroelectric Power Plant (PLTA) is one of the power plants located in Sidikalang which is very suitable for use as a Solar Power Plant (PLTS) which is located in a very large pool and because the Control Pool does not require excavation. for installation and more stable. By using the Helioscope software, the results were obtained in the form of solar panels used in floating PLTS on a pound controller totaling 20,441 solar panels with a Polycristaline model with a power of 300 Wp with the Blue Sun Solar Energy BSM270-300P-60 (300W) type, with the resulting power being 6.12 MWp , The batteries in the PLTS consist of 275 series and 3.5 parallel units so that the total battery required is 1,100 JYC batteries type OPzV3000, and 9 ABB brand inverters type PVI 500 TL CN with a power of 560 kW with a voltage of 360 and the value obtained is the calculation using BMKG data is 308,177 kWh while using Helioscope Software is 489,659 kWh for monthly.
format Article
id doaj-art-e9c3443f4c1548f3bc25eb9b598cfa01
institution Kabale University
issn 2723-0589
language English
publishDate 2024-02-01
publisher Universitas Negeri Padang
record_format Article
series Jurnal Teknik Elektro Indonesia
spelling doaj-art-e9c3443f4c1548f3bc25eb9b598cfa012025-08-20T03:53:27ZengUniversitas Negeri PadangJurnal Teknik Elektro Indonesia2723-05892024-02-015114715610.24036/jtein.v5i1.611611Solar Energy Potential In Regulating Pond Hydroelectric Power Plant Renun Using HelioscopeGatot Mochamad Muchtar0Purnama Helena Hutabarat1Universitas Muhammadiyah Sumatra UtaraAmik Parbina NusantaraThe availability of fossil fuels is increasingly depleting and environmental problems resulting from burning fossil fuels have an impact on environmental problems in the global region, so that efforts are needed to promote alternative energy sources called renewable energy. The Renun Hydroelectric Power Plant (PLTA) is one of the power plants located in Sidikalang which is very suitable for use as a Solar Power Plant (PLTS) which is located in a very large pool and because the Control Pool does not require excavation. for installation and more stable. By using the Helioscope software, the results were obtained in the form of solar panels used in floating PLTS on a pound controller totaling 20,441 solar panels with a Polycristaline model with a power of 300 Wp with the Blue Sun Solar Energy BSM270-300P-60 (300W) type, with the resulting power being 6.12 MWp , The batteries in the PLTS consist of 275 series and 3.5 parallel units so that the total battery required is 1,100 JYC batteries type OPzV3000, and 9 ABB brand inverters type PVI 500 TL CN with a power of 560 kW with a voltage of 360 and the value obtained is the calculation using BMKG data is 308,177 kWh while using Helioscope Software is 489,659 kWh for monthly.http://jtein.ppj.unp.ac.id/index.php/JTEIN/article/view/611
spellingShingle Gatot Mochamad Muchtar
Purnama Helena Hutabarat
Solar Energy Potential In Regulating Pond Hydroelectric Power Plant Renun Using Helioscope
Jurnal Teknik Elektro Indonesia
title Solar Energy Potential In Regulating Pond Hydroelectric Power Plant Renun Using Helioscope
title_full Solar Energy Potential In Regulating Pond Hydroelectric Power Plant Renun Using Helioscope
title_fullStr Solar Energy Potential In Regulating Pond Hydroelectric Power Plant Renun Using Helioscope
title_full_unstemmed Solar Energy Potential In Regulating Pond Hydroelectric Power Plant Renun Using Helioscope
title_short Solar Energy Potential In Regulating Pond Hydroelectric Power Plant Renun Using Helioscope
title_sort solar energy potential in regulating pond hydroelectric power plant renun using helioscope
url http://jtein.ppj.unp.ac.id/index.php/JTEIN/article/view/611
work_keys_str_mv AT gatotmochamadmuchtar solarenergypotentialinregulatingpondhydroelectricpowerplantrenunusinghelioscope
AT purnamahelenahutabarat solarenergypotentialinregulatingpondhydroelectricpowerplantrenunusinghelioscope