Analysis of the Load Sharing Behaviour and Cushion Failure Mode for a Disconnected Piled Raft
Disconnected piled raft (DPR) foundations are characterized by having no structural connection to a raft. The raft-pile gap is filled with a granular cushion, which creates a more uniform pressure distribution on the raft and reduces the differential settlement. A series of tests has been performed...
Saved in:
| Main Author: | Xiao-jun Zhu |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Wiley
2017-01-01
|
| Series: | Advances in Materials Science and Engineering |
| Online Access: | http://dx.doi.org/10.1155/2017/3856864 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Horizontal Loading Tests on Disconnected Piled Rafts and a Simplified Method to Evaluate the Horizontal Bearing Capacity
by: Xiao-jun Zhu, et al.
Published: (2018-01-01) -
Nonlinear analysis of pile raft foundations under eccentric loads
by: Khalid Qasim Hussein, et al.
Published: (2023-09-01) -
Influence of Raft in the Analysis of Granular Piles
by: Solanki Ashish, et al.
Published: (2025-06-01) -
Simplified method for estimating settlement of disconnected piled raft foundations based on a finite element approach using interaction factors
by: Boyoung Yoon, et al.
Published: (2025-04-01) -
Numerical Study on Optimization of Piled Raft Foundation on Stratified Soil under Static Load
by: Getasew Mare Yirsaw, et al.
Published: (2023-01-01)