Analysis and Measure of Overload Fault of Train Auxiliary Converter on Changsha Metro Line 1
Since the trial operation of Changsha metro line 1, the train auxiliary converter has been overloaded many times,which has affected the normal operation of the train. The causes of the overload of the train auxiliary converter were analyzed,and the simulation test was carried out. The real causes of...
Saved in:
| Main Authors: | Chao YANG, Yi YIN |
|---|---|
| Format: | Article |
| Language: | zho |
| Published: |
Editorial Department of Electric Drive for Locomotives
2019-07-01
|
| Series: | 机车电传动 |
| Subjects: | |
| Online Access: | http://edl.csrzic.com/thesisDetails#10.13890/j.issn.1000-128x.2019.04.030 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Design of Changsha Metro Line 2 CBTC System
by: LV Hao-jiong, et al.
Published: (2014-01-01) -
Three Core Systems Integration in Changsha Metro Line 2
by: ZHOU Xiao-ming, et al.
Published: (2014-01-01) -
Platform Design of Auxiliary Converter for Metro Vehicle
by: LIU Qing, et al.
Published: (2015-01-01) -
Auxiliary Converter System Used in Shenyang Metro Line 1 Vehicle
by: LI Shaobo, et al.
Published: (2016-01-01) -
Analysis of Energy Absorption Device Operation in Changsha Metro Line 1
by: Zhangshuo PENG, et al.
Published: (2019-09-01)