Analysis and Measure of Overload Fault of Train Auxiliary Converter on Changsha Metro Line 1

Since the trial operation of Changsha metro line 1, the train auxiliary converter has been overloaded many times,which has affected the normal operation of the train. The causes of the overload of the train auxiliary converter were analyzed,and the simulation test was carried out. The real causes of...

Full description

Saved in:
Bibliographic Details
Main Authors: Chao YANG, Yi YIN
Format: Article
Language:zho
Published: Editorial Department of Electric Drive for Locomotives 2019-07-01
Series:机车电传动
Subjects:
Online Access:http://edl.csrzic.com/thesisDetails#10.13890/j.issn.1000-128x.2019.04.030
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1850142799073116160
author Chao YANG
Yi YIN
author_facet Chao YANG
Yi YIN
author_sort Chao YANG
collection DOAJ
description Since the trial operation of Changsha metro line 1, the train auxiliary converter has been overloaded many times,which has affected the normal operation of the train. The causes of the overload of the train auxiliary converter were analyzed,and the simulation test was carried out. The real causes of the overload of the train auxiliary converter were obtained. Finally, the corresponding solutions were put forward.
format Article
id doaj-art-e553d2473f314f20ab2f4719fe56c481
institution OA Journals
issn 1000-128X
language zho
publishDate 2019-07-01
publisher Editorial Department of Electric Drive for Locomotives
record_format Article
series 机车电传动
spelling doaj-art-e553d2473f314f20ab2f4719fe56c4812025-08-20T02:28:55ZzhoEditorial Department of Electric Drive for Locomotives机车电传动1000-128X2019-07-01141143,15620924275Analysis and Measure of Overload Fault of Train Auxiliary Converter on Changsha Metro Line 1Chao YANGYi YINSince the trial operation of Changsha metro line 1, the train auxiliary converter has been overloaded many times,which has affected the normal operation of the train. The causes of the overload of the train auxiliary converter were analyzed,and the simulation test was carried out. The real causes of the overload of the train auxiliary converter were obtained. Finally, the corresponding solutions were put forward.http://edl.csrzic.com/thesisDetails#10.13890/j.issn.1000-128x.2019.04.030Changsha metro line 1auxiliary converteroverloadfault diagnosissolution
spellingShingle Chao YANG
Yi YIN
Analysis and Measure of Overload Fault of Train Auxiliary Converter on Changsha Metro Line 1
机车电传动
Changsha metro line 1
auxiliary converter
overload
fault diagnosis
solution
title Analysis and Measure of Overload Fault of Train Auxiliary Converter on Changsha Metro Line 1
title_full Analysis and Measure of Overload Fault of Train Auxiliary Converter on Changsha Metro Line 1
title_fullStr Analysis and Measure of Overload Fault of Train Auxiliary Converter on Changsha Metro Line 1
title_full_unstemmed Analysis and Measure of Overload Fault of Train Auxiliary Converter on Changsha Metro Line 1
title_short Analysis and Measure of Overload Fault of Train Auxiliary Converter on Changsha Metro Line 1
title_sort analysis and measure of overload fault of train auxiliary converter on changsha metro line 1
topic Changsha metro line 1
auxiliary converter
overload
fault diagnosis
solution
url http://edl.csrzic.com/thesisDetails#10.13890/j.issn.1000-128x.2019.04.030
work_keys_str_mv AT chaoyang analysisandmeasureofoverloadfaultoftrainauxiliaryconverteronchangshametroline1
AT yiyin analysisandmeasureofoverloadfaultoftrainauxiliaryconverteronchangshametroline1