Introduction to Two Construction Methods For Cast-in-bagform Conrete Revetment
Saved in:
| Main Author: | 黄小雄 |
|---|---|
| Format: | Article |
| Language: | zho |
| Published: |
Editorial Office of Pearl River
2004-01-01
|
| Series: | Renmin Zhujiang |
| Online Access: | http://www.renminzhujiang.cn/thesisDetails?columnId=47670395&Fpath=home&index=0 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Considerations of Ecologic Revetment Construction for River Tributaries in Guangzhou City
by: ZHENG Min
Published: (2005-01-01) -
Construction of Bag-filled Concrete Bank Revetment for Flood Improvement of Liuxi River
by: 雷衍波
Published: (2004-01-01) -
Experimental and numerical investigation on the mechanical performance of novel composite revetment piles
by: Bixing Yan, et al.
Published: (2025-12-01) -
Revetment Rock Armour Stability Under Depth-Limited Breaking Waves
by: Alexander F. Nielsen, et al.
Published: (2025-04-01) -
Selection of Types for Embankment and Revetment of Stage Ⅲ Improvement Project of Shenzhen River
by: 陈锦庆, et al.
Published: (2002-01-01)